Energy and reserve scheduling under correlated nodal demand uncertainty: An adjustable robust optimization approach
暂无分享,去创建一个
[1] Melvyn Sim,et al. The Price of Robustness , 2004, Oper. Res..
[2] Jose M. Arroyo,et al. Energy and Reserve Scheduling Under a Joint Generation and Transmission Security Criterion: An Adjustable Robust Optimization Approach , 2014, IEEE Transactions on Power Systems.
[3] K. Sekihara,et al. Average-intensity reconstruction and Wiener reconstruction of bioelectric current distribution based on its estimated covariance matrix , 1995, IEEE Transactions on Biomedical Engineering.
[4] Melvyn Sim,et al. Robust discrete optimization and network flows , 2003, Math. Program..
[5] M. Shahidehpour,et al. Contingency-Constrained Reserve Requirements in Joint Energy and Ancillary Services Auction , 2009, IEEE Transactions on Power Systems.
[6] Aharon Ben-Tal,et al. Adjustable robust counterpart of conic quadratic problems , 2008, Math. Methods Oper. Res..
[7] M. Shahidehpour,et al. Stochastic Security-Constrained Unit Commitment , 2007, IEEE Transactions on Power Systems.
[8] Jacques F. Benders,et al. Partitioning procedures for solving mixed-variables programming problems , 2005, Comput. Manag. Sci..
[9] Alexandre Street,et al. Energy and reserve scheduling under correlated nodal demand uncertainty: An adjustable robust optimization approach , 2015 .
[10] Xu Andy Sun,et al. Adaptive Robust Optimization for the Security Constrained Unit Commitment Problem , 2013, IEEE Transactions on Power Systems.
[11] Stephen P. Boyd,et al. Convex Optimization , 2004, Algorithms and Theory of Computation Handbook.
[12] C. R. Dietrich,et al. Computationally efficient cholesky factorization of a covariance matrix with block toeplitz structure , 1993 .
[13] Antonio J. Conejo,et al. Probabilistic power flow with correlated wind sources , 2010 .
[14] A. Ben-Tal,et al. Adjustable robust solutions of uncertain linear programs , 2004, Math. Program..
[15] Philip G. Hill,et al. Power generation , 1927, Journal of the A.I.E.E..
[16] Shmuel S. Oren,et al. Design of ancillary service markets , 2001, Proceedings of the 34th Annual Hawaii International Conference on System Sciences.
[17] François Bouffard,et al. Scheduling and Pricing of Coupled Energy and Primary, Secondary, and Tertiary Reserves , 2005, Proceedings of the IEEE.
[18] Mohammad Shahidehpour,et al. The IEEE Reliability Test System-1996. A report prepared by the Reliability Test System Task Force of the Application of Probability Methods Subcommittee , 1999 .
[19] Yongpei Guan,et al. Two-stage robust optimization for N-k contingency-constrained unit commitment , 2012, IEEE Transactions on Power Systems.
[20] J. M. Arroyo,et al. Contingency-Constrained Unit Commitment With $n - K$ Security Criterion: A Robust Optimization Approach , 2011, IEEE Transactions on Power Systems.
[21] S. Granville,et al. Strategic bidding under uncertainty: a binary expansion approach , 2005, IEEE Transactions on Power Systems.
[22] Ruiwei Jiang,et al. Robust Unit Commitment With Wind Power and Pumped Storage Hydro , 2012, IEEE Transactions on Power Systems.