Optimal production strategy of bimetallic deposits under technical and economic uncertainties using stochastic chance-constrained programming

In order to catch up with reality, all the macro-decisions related to long-term mining production planning must be made simultaneously and under uncertain conditions of determinant parameters. By taking advantage of the chance-constrained programming, this paper presents a stochastic model to create an optimal strategy for producing bimetallic deposit open-pit mines under certain and uncertain conditions. The uncertainties of grade, price per product, and capacities of the various stages in the process of production of the final product were considered. The results of solving the deterministic and stochastic models showed that the stochastic model had a greater compatibility and performance than the other ones.

[1]  Javad Sattarvand,et al.  Long term production planning of open pit mines by ant colony optimization , 2015, Eur. J. Oper. Res..

[2]  R. Dimitrakopoulos,et al.  Uncertainty-based production scheduling in open pit mining , 2004 .

[3]  John M. Wilson,et al.  Introduction to Stochastic Programming , 1998, J. Oper. Res. Soc..

[4]  J. Gholamnejad Incorporation of rehabilitation cost into the optimum cut-off grade determination , 2009 .

[5]  Mohammad Ataei,et al.  Determination of optimum cutoff grades of multiple metal deposits by using the Golden Section search method , 2003 .

[6]  Lou Caccetta,et al.  An Application of Branch and Cut to Open Pit Mine Scheduling , 2003, J. Glob. Optim..

[7]  Ady A. D. Van-Dúnem Open-pit mine production scheduling under grade uncertainty , 2017 .

[8]  R. Dimitrakopoulos,et al.  A maximum upside / minimum downside approach to the traditional optimization of open pit mine design , 2007 .

[9]  Mohammad Anemangely,et al.  Optimal cut-off grade determination based on variable capacities in open-pit mining , 2012 .

[10]  Roussos G. Dimitrakopoulos,et al.  Global optimization of open pit mining complexes with uncertainty , 2016, Appl. Soft Comput..

[11]  Behrooz Karimi,et al.  Long-term open pit mine production planning: a review of models and algorithms , 2008 .

[12]  Erkan Topal,et al.  Net present value maximization model for optimum cut-off grade policy of open pit mining operations , 2011 .

[13]  Thys B Johnson,et al.  OPTIMUM OPEN PIT MINE PRODUCTION SCHEDULING , 1968 .