Bottleneck-Oriented Order Release: An Assessment by Simulation

Bottleneck-oriented order release has been advocated as an effective and simplified strategy for production control. Due to product mix changes and jobs processing time variety, the emergence of short term shifting bottlenecks is typical in low-volume and high-variety manufacturing. But is bottleneck-oriented order release effective in this production environment? In this paper, we report a simulation study carried out to evaluate the performance of two bottleneck-oriented strategies: Fixed Bottleneck Control (FBC) and Dynamic Bottleneck control (DBC). The performance of these strategies is compared with the performance of Workload Control (WLC) under three levels of bottleneck criticality in terms of the overload imposed to the system bottleneck relatively to the non-bottlenecks. Results show that the WLC clearly outperforms both, FBC and DBC. Moreover, the DBC showed to perform better than the FBC only when the level of bottleneck criticality is low, i.e. when the workload is balanced across work centres.

[1]  James F. Cox,et al.  Designing unbalanced lines - understanding protective capacity and protective inventory , 2002 .

[2]  James F. Cox,et al.  Competitive factors and performance measurement: Applying the theory of constraints to meet customer needs , 1994 .

[3]  Nuno O. Fernandes,et al.  Workload control in unbalanced job shops , 2014 .

[4]  Nuno O. Fernandes,et al.  Workload control under continuous order release , 2011 .

[5]  Mark Stevenson,et al.  The theory and practice of workload control: A research agenda and implementation strategy , 2011 .

[6]  Arnold H. Buss,et al.  SHIFTING PRODUCTION BOTTLENECKS: CAUSES, CURES, AND CONUNDRUMS , 2009 .

[7]  Jacob V. Simons,et al.  AN EXPOSITION OF MULTIPLE CONSTRAINT SCHEDULING AS IMPLEMENTED IN THE GOAL SYSTEM (FORMERLY DISASTERTM) , 2009 .

[8]  S. T. Enns An integrated system for controlling shop loading and work flow , 1995 .

[9]  Oliver Rose,et al.  CONLOAD—a new lot release rule for semiconductor wafer fabs , 1999, WSC '99.

[10]  Marco Tantardini,et al.  A lean-based ORR system for non-repetitive manufacturing , 2012 .

[11]  Mark Stevenson,et al.  A review of production planning and control: the applicability of key concepts to the make-to-order industry , 2005 .

[12]  J. Little A Proof for the Queuing Formula: L = λW , 1961 .

[13]  Jeff Cox,et al.  The goal : excellence in manufacturing , 1984 .

[14]  Robert M. O'Keefe,et al.  Order Release in Automated Manufacturing Systems , 1995 .

[15]  Lawrence D. Fredendall,et al.  The impact of non-bottleneck variation in a manufacturing cell , 2002 .

[16]  Martin Land,et al.  Workload control concepts in job shops A critical assessment , 1995 .

[17]  Basheer M. Khumawala,et al.  A study on the effect of the extent and location of protective capacity in flow systems , 2000 .

[18]  Eliyahu M. Goldratt,et al.  What is this thing called theory of constraints and how should it be implemented , 1990 .

[19]  Lawrence D. Fredendall,et al.  Concerning the theory of workload control , 2010, Eur. J. Oper. Res..

[20]  Lawrence M. Wein,et al.  Scheduling semiconductor wafer fabrication , 1988 .

[21]  Lawrence D. Fredendall,et al.  Protective capacity positioning: Impact on manufacturing cell performance , 2001, Eur. J. Oper. Res..

[22]  Anabela Carvalho Alves,et al.  A Framework for Understanding Cellular Manufacturing Systems , 2004 .

[23]  Mauricio G. C. Resende,et al.  Closed-loop job release control for VLSI circuit manufacturing , 1988 .