文
论文分享
演练场
杂货铺
论文推荐
字
编辑器下载
登录
注册
Construction Technology for Handling Defected Pile No.32-5 of Shengmi Bridge in Nanchang
复制论文ID
分享
摘要
作者
参考文献
暂无分享,去
创建一个
In the light of the defects arising in construction of Pile No.32-5 of the Shengmi Bridge, this paper focuses on the causes, handling schemes, handling by grout injecting of the defects as well as re-inspecting of the pile having been handled.
Liu An
保存到论文桶