Construction Technology for Handling Defected Pile No.32-5 of Shengmi Bridge in Nanchang

In the light of the defects arising in construction of Pile No.32-5 of the Shengmi Bridge, this paper focuses on the causes, handling schemes, handling by grout injecting of the defects as well as re-inspecting of the pile having been handled.