Rework in urban renewal projects in Colombia

AbstractThere is a paucity of systematic knowledge on the dynamics of rework in urban renewal projects even though such projects frequently exceed budget and schedule. The causal factors of rework and cost impact on 69 Colombian public projects are examined. The nomenclature of project, organization, and people (POP) is used to categorize causal variables and develop a generic systemic model of rework causation. Inadequate initial budgets, poor project design (which instigated changes during construction), and the social inclusivity of contracts in Colombia (which employ local inexperienced people to conduct the required work) were the most significant contributors of rework. The developed model provides decision makers and stakeholders with insights about the interdependencies and behavior between key influencing variables in Colombian urban renewal projects, and can be used to stimulate learning and process improvements in future projects.

[1]  O. Williamson Transaction-Cost Economics: The Governance of Contractual Relations , 1979, The Journal of Law and Economics.

[2]  Kenneth Cooper Naval Ship Production: A Claim Settled and a Framework Built , 1980 .

[3]  A. Michalos Risk: A Philosophical Introduction to the Theory of Risk Evaluation and Management , 1984 .

[4]  正弘 中舘 OECD (経済開発協力機構) : Organization for Economic Co-operation and Development , 1991 .

[5]  W. B. Ledbetter,et al.  Causes of Quality Deviations in Design and Construction , 1992 .

[6]  Lois W. Sayrs Interviews : an introduction to qualitative research interviewing , 1996 .

[7]  Peter E.D. Love,et al.  Determining the causal structure of rework influences in construction , 1999 .

[8]  Peter E.D. Love,et al.  Quantifying the causes and costs of rework in construction , 2000 .

[9]  C. Tomkins,et al.  Quality failure costs in civil engineering projects , 2000 .

[10]  Makarand Hastak,et al.  Risk Factors Affecting Management and Maintenance Cost of Urban Infrastructure , 2001 .

[11]  James M. Lyneis,et al.  Strategic management of complex projects: a case study using system dynamics , 2001 .

[12]  Peter E.D. Love,et al.  Influence of Project Type and Procurement Method on Rework Costs in Building Construction Projects , 2002 .

[13]  Lyn Richards,et al.  Readme First for a User's Guide to Qualitative Methods , 2002 .

[14]  Aminah Robinson Fayek,et al.  Developing a standard methodology for measuring and classifying construction field rework , 2004 .

[15]  Peter E.D. Love,et al.  Forensic project management: The underlying causes of rework in construction projects , 2004 .

[16]  David N. Ford,et al.  MANAGING RISK AND UNCERTAINTY IN COMPLEX CAPITAL PROJECTS , 2004 .

[17]  B. Flyvbjerg Five Misunderstandings About Case-Study Research , 2006, 1304.1186.

[18]  Lauri Koskela,et al.  Foundations of concurrent engineering , 2006 .

[19]  Peter E.D. Love,et al.  Mapping rework causes and effects using artificial neural networks , 2008 .

[20]  David J. Edwards,et al.  Forensic Project Management: An Exploratory Examination of the Causal Behavior of Design-Induced Rework , 2008, IEEE Transactions on Engineering Management.

[21]  Bon-Gang Hwang,et al.  Measuring the Impact of Rework on Construction Cost Performance , 2009 .

[22]  Peter E.D. Love,et al.  Rework in Civil Infrastructure Projects: Determination of Cost Predictors , 2010 .

[23]  Peter E.D. Love,et al.  Dynamics of Rework in Complex Offshore Hydrocarbon Projects , 2011 .

[24]  Paul M. Goodrum,et al.  Construction Small-Projects Rework Reduction for Capital Facilities , 2012 .

[25]  David J. Edwards,et al.  Moving Beyond Optimism Bias and Strategic Misrepresentation: An Explanation for Social Infrastructure Project Cost Overruns , 2012, IEEE Transactions on Engineering Management.

[26]  J. Parada Plan de Desarrollo , 2012 .

[27]  Alcaldía de Medellín,et al.  Proyecto de Acuerdo Plan de Desarrollo “Medellín un hogar para la vida” 2012 – 2015 , 2012 .

[28]  Sangwon Han,et al.  Analysis of Causes of Construction Defects Using Fault Trees and Risk Importance Measures , 2013 .

[29]  Peter E.D. Love,et al.  Determining the Probability of Project Cost Overruns , 2013 .

[30]  Peter E.D. Love,et al.  Rework in highway projects , 2014 .

[31]  Timothy R. B. Taylor,et al.  Modeling the Impact of Design Rework on Transportation Infrastructure Construction Project Performance , 2014 .

[32]  Peter E.D. Love,et al.  Role of Design Audits in Reducing Errors and Rework: Lessons from Hong Kong , 2014 .

[33]  Keith R. Molenaar,et al.  Construction Management Challenges and Best Practices for Rural Transit Projects , 2015 .

[34]  Peter E.D. Love,et al.  Determining Overpricing in Brazilian Infrastructure Projects: A Forensic Approach , 2016 .

[35]  Christine Nadel,et al.  Case Study Research Design And Methods , 2016 .

[36]  Estudios Económicos de la OECD: Colombia 2019 , 2019 .