Two-stage method and application for molten iron scheduling problem between iron-making plants and steel-making plants
暂无分享,去创建一个
[1] Qiu Jian,et al. DEVELOPMENT OF TRANSPORT SCHEDULING APPLICATION SOFTWARE FOR IRON-STEEL INTERFACE AT BAOSTEEL , 2003 .
[2] Lixin Tang,et al. A Column Generation for Locomotive Scheduling Problem in Molten Iron Transportation , 2007, 2007 IEEE International Conference on Automation and Logistics.
[3] Lixin Tang,et al. A branch-and-price algorithm to solve the molten iron allocation problem in iron and steel industry , 2007, Comput. Oper. Res..
[4] Xu Xin-he,et al. Design and Realization of the Iron Melt Transport Simulating System , 2003 .
[5] Jacques Teghem,et al. A mixed-integer linear programming model for the continuous casting planning , 2006 .
[6] Arezoo Atighehchian,et al. A novel hybrid algorithm for scheduling steel-making continuous casting production , 2009, Comput. Oper. Res..
[7] Dongfeng He,et al. Modeling and Calculation for the Molten Iron Preparation Problem Based on Production Scheduling of Steelmaking Area , 2009 .
[8] Lixin Tang,et al. Steelmaking and refining coordinated scheduling problem with waiting time and transportation consideration , 2010, Comput. Ind. Eng..