Two-stage method and application for molten iron scheduling problem between iron-making plants and steel-making plants

Abstract In this paper, a two-stage method is proposed to solve the molten iron scheduling problem (MISP). Firstly, a 0-1 mixed-integer nonlinear programming model is established for special type of molten iron scheduling problem (STMISP). A method to solve mathematical model of STMISP is presented, which include assigning machine strategy of STMISP and determining mathematical model of eliminating machine conflicts. Secondly, on the basis of results of STMISP, a heuristic algorithm based on the rule of first come first serve (FCFS) principle is established to solve normal type of molten iron scheduling problem (NTMISP). The molten iron scheduling system with the two-stage method has been successfully applied to Shanghai Baosteel Company to realize quickly optimal molten iron scheduling. Application results show that the two-stage method is both effective and feasible.