An assessment of wind energy potential at the demonstration offshore wind farm in Korea

The construction of an offshore demonstration wind farm was planned in a southwestern sea-area of the Korean Peninsula. To estimate economic feasibility and to establish a reliable design basis, it is necessary to identify the design parameters of the demo-farm. For a reliable estimation of the design parameters, the first offshore meteorological mast, HeMOSU (Herald of the Meteorological and Oceanographic Special Research Unit), was constructed at the site of the demo-farm. In addition, supplementary meteorological masts were installed in advance at Gochang and Wangdeung-do in order to enhance the estimation of the long-term wind potential for the demo-farm. In this paper, assessments of wind energy potential are carried out with the data measured from these three meteorological masts. The analysis includes seasonal and diurnal changes in wind speed and surface roughness as well as wind/energy rose. Long-term wind potential is also estimated by using MCP (Measure-Correlate-Predict) techniques to clarify the design basis and to determine the wind turbine class in accordance with IEC 61400. The AEP (Annual Energy Production), as well as the C.F. (Capacity Factor) of the candidate site are evaluated with the estimated design parameters.

[1]  S. Rehman,et al.  Assessment of wind energy potential for coastal locations of the Kingdom of Saudi Arabia , 2004 .

[2]  Jianzhou Wang,et al.  Wind energy potential assessment for the site of Inner Mongolia in China , 2013 .

[3]  W. Frost,et al.  Engineering handbook on the atmospheric environmental guidelines for use in wind turbine generator development , 1978 .

[4]  Nasrudin Abd Rahim,et al.  Assessment of wind energy potentiality at Kudat and Labuan, Malaysia using Weibull distribution function , 2011 .

[5]  Kyungnam Ko,et al.  Variations of wind speed in time on Jeju Island, Korea , 2010 .

[6]  Hee-Chang Lim,et al.  Wind energy estimation of the Wol-Ryong coastal region , 2010 .

[7]  S. Nadarajah,et al.  Extreme Value Distributions: Theory and Applications , 2000 .

[8]  Jianzhou Wang,et al.  A corrected hybrid approach for wind speed prediction in Hexi Corridor of China , 2011 .

[9]  Ki-Yong Oh,et al.  Assessment of Wind Resource Around the Korean Peninsula by Using Marine Buoys Datasets , 2011 .

[10]  Simon J. Watson,et al.  A new matrix method of predicting long-term wind roses with MCP , 1997 .

[11]  Nevzat Onat,et al.  Analysis of wind climate and wind energy potential of regions in Turkey , 2011 .

[12]  Ki‐Yong Oh,et al.  Wind resource assessment around Korean Peninsula for feasibility study on 100 MW class offshore wind farm , 2012 .

[13]  Ali Dinler A new low-correlation MCP (measure-correlate-predict) method for wind energy forecasting , 2013 .

[14]  Jea-Kyung Jang,et al.  QuikSCAT 위성 데이터를 이용한 한반도 주변의 해상 풍력자원 평가 , 2009 .

[15]  Nam-Ho Kyong,et al.  Establishment of the Low-Resolution National Wind Map by Numerical Wind Simulation , 2006 .

[16]  J. A. Carta,et al.  A new probabilistic method to estimate the long-term wind speed characteristics at a potential wind , 2011 .