Przegląd modeli optymalizacyjnych stosowanych w analizie czasowo-kosztowej przedsięwzięć
暂无分享,去创建一个
[1] Chris Hendrickson,et al. Project Management for Construction: Fundamental Concepts for Owners, Engineers, Architects, and Builders , 1989 .
[2] Martin Skutella,et al. Approximation Algorithms for the Discrete Time-Cost Tradeoff Problem , 1997, Math. Oper. Res..
[3] R. R. Hocking,et al. Optimum Time Compression in Project Scheduling , 1970 .
[4] M. Vanhoucke,et al. THE DISCRETE TIME/COST TRADE-OFF PROBLEM UNDER VARIOUS ASSUMPTIONS EXACT AND HEURISTIC PROCEDURES , 2005 .
[5] John F. Muth,et al. A Dynamic Programming Algorithm for Decision CPM Networks , 1979, Oper. Res..
[6] Helena Gaspars. Analiza czasowo-kosztowa (CPM-COST). Algorytm a model optymalizacyjny , 2006 .
[7] S. Selcuk Erenguc,et al. Project Scheduling Problems: A Survey , 1993 .
[8] Cengiz Haksever,et al. Flexible Model for Time'Cost Tradeoff Problem , 2004 .
[9] E. B. Berman,et al. Resource Allocation in a PERT Network Under Continuous Activity Time-Cost Functions , 1964 .
[10] D. R. Robinson. A Dynamic Programming Solution to Cost-Time Tradeoff for CPM , 1975 .