Damaging Open-Phase Overvoltage Disturbance on a Shunt-Compensated 500-kV Line Initiated by Unintended Trip
暂无分享,去创建一个
Mukesh Nagpal | Terrence G. Martinich | Amit Bimbhra | Dave Sydor | M. Nagpal | T. Martinich | A. Bimbhra | D. Sydor
[1] F. Iliceto,et al. Overvoltages Due to Open-Phase Occurrence in Reactor Compensated EHV Lines , 1984, IEEE Power Engineering Review.
[2] E. W. Kimbark. Suppression of Ground-Fault Arcs on Single-Pole-Switched EHV Lines by Shunt Reactors , 1964 .
[3] Aniruddha M. Gole,et al. Implementation and Performance Evaluation of a Reclosing Method for Shunt Reactor-Compensated Transmission Lines , 2011 .
[4] Miles Redfern,et al. Effects of Transmission Line Construction on Resonance in Shunt Compensated EHV Lines , 2005 .
[5] D. F. Peelo,et al. Controlled closing on shunt reactor compensated transmission lines. II. Application of closing control device for high-speed autoreclosing on BC Hydro 500 kV transmission line , 1997 .
[6] D. F. Peelo,et al. Controlled closing on shunt reactor compensated transmission lines. I. Closing control device development , 1997 .