Schedules and Schedulers: A Study in the U.S. Construction Industry

This research examines how the construction industry addresses the roles of schedulers and schedules, with the goal of improving current practices. We use a mixed-mode approach of qualitative and q...

[1]  Hyunjoo Kim,et al.  Generating construction schedules through automatic data extraction using open BIM (building information modeling) technology , 2013 .

[2]  Asim Karim,et al.  CONSCOM: An OO Construction Scheduling and Change Management System , 1999 .

[3]  Fernanda Leite,et al.  Investigating Impacts, Drivers, and Leading Indicators of Premature Starts to Construction , 2016 .

[4]  Patricia D. Galloway,et al.  Survey of the Construction Industry Relative to the Use of CPM Scheduling for Construction Projects , 2006 .

[5]  Alexander Laufer Essentials of Project Planning: Owner’s Perspective , 1990 .

[6]  Ming Lu,et al.  Automated Generation of Work Breakdown Structure and Project Network Model for Earthworks Project Planning: A Flow Network-Based Optimization Approach , 2017 .

[7]  Herbert A. Applebaum Construction Management: Traditional versus Bureaucratic Methods , 1982 .

[8]  Russell L. Ackoff A concept of corporate planning , 1969 .

[9]  Robert M. D’Onofrio CPM Scheduling: A 60-Year History , 2017 .

[10]  W. Duncan A GUIDE TO THE PROJECT MANAGEMENT BODY OF KNOWLEDGE , 1996 .

[11]  William Ibbs,et al.  Schedule Analysis under the Effect of Resource Allocation , 2007 .

[12]  Aviad Shapira,et al.  Only Dynamics Can Absorb Dynamics , 2006 .

[13]  James M. Antill,et al.  Critical path methods in construction practice , 1970 .

[14]  Alexander Laufer A micro view of the project planning process , 1992 .

[15]  Aviad Shapira,et al.  Prebid and Preconstruction Planning Process , 1993 .

[16]  Albert P.C. Chan,et al.  Factors Affecting the Success of a Construction Project , 2004 .

[17]  Gunnar Lucko,et al.  Construction spatial modeling and scheduling with three-dimensional singularity functions , 2014 .

[18]  Nuhu Braimah,et al.  Construction Delay Analysis Techniques—A Review of Application Issues and Improvement Needs , 2013 .

[19]  Glenn Ballard,et al.  What Kind of Production Is Construction , 1998 .

[20]  John W. Creswell,et al.  Research Design: Qualitative, Quantitative, and Mixed Methods Approaches , 2010 .

[21]  Farook Hamzeh,et al.  Understanding the planner’s role in lookahead construction planning , 2019, Production Planning & Control.

[22]  Richard L. Tucker,et al.  Competence and timing dilemma in construction planning , 1988 .

[23]  Andy P. Field,et al.  Discovering Statistics Using SPSS , 2000 .

[24]  Joseph D. Langford,et al.  Focus Groups: Supporting Effective Product Development , 2002 .

[25]  Bhargav Dave,et al.  Visilean: Designing a production management system with lean and BIM , 2011 .

[26]  M. Kraska-MIller,et al.  Nonparametric Statistics for Social and Behavioral Sciences , 2013 .

[27]  Gregory Howell,et al.  The Underlying Theory of Project Management Is Obsolete , 2008, IEEE Engineering Management Review.

[28]  Radhlinah Aulin,et al.  Assessing Understanding of Planning and Scheduling Theory and Practice on Construction Projects , 2015 .

[29]  Donald D. Tippett,et al.  Measuring Project Success in the Construction Industry , 2004 .

[30]  Aviad Shapira,et al.  The multiplicity concept in construction project planning , 1994 .

[31]  Gregory A. Howell,et al.  SHIELDING PRODUCTION: ESSENTIAL STEP IN PRODUCTION CONTROL , 1998 .

[32]  Olli Seppänen,et al.  Survey Comparing Critical Path Method, Last Planner System, and Location-Based Techniques , 2019 .

[33]  Olli Seppänen,et al.  Improving workflow and resource usage in construction schedules through location-based management system (LBMS) , 2018 .

[34]  Alexander Laufer Decision‐Making Roles in Project Planning , 1990 .

[35]  Willy Herroelen,et al.  Robust and reactive project scheduling: a review and classification of procedures , 2004 .

[36]  Farook Hamzeh,et al.  Improving Construction Workflow- The Role of Production Planning and Control , 2009 .

[37]  Hemanta Doloi,et al.  Cost Overruns and Failure in Project Management: Understanding the Roles of Key Stakeholders in Construction Projects , 2013 .

[38]  Richard L. Tucker,et al.  Is construction project planning really doing its job? A critical examination of focus, role and process , 1987 .

[39]  Kiyoung Son,et al.  Survey of Motivations, Benefits, and Implementation Challenges of Last Planner System Users , 2013 .

[40]  David K. H. Chua,et al.  Key determinants for construction schedule performance , 1999 .