Reappraisal of Auxiliary Supply and Controls for Avon No. 8

Because Avon No. 8 is a supercritical unit, slight modifications from former practices were made in the control and auxiliary supply during the design period. These practices and their modifications are reappraised in terms of the experience gained in putting the unit on the line and operating it for two years along with changes made in this period.

[1]  Clarence F. Paulus Eastlake Reappraised [includes discussion] , 1956, Transactions of the American Institute of Electrical Engineers. Part III: Power Apparatus and Systems.

[2]  R. F. Willett Electrical Control Features of the Avon Supercritical-Pressure Unit , 1958, Transactions of the American Institute of Electrical Engineers. Part III: Power Apparatus and Systems.

[3]  C. F. Paulus,et al.  Auxiliary System for a Supercritical Unit a Design Based on a Tested System for a Subcritical Unit , 1959, Transactions of the American Institute of Electrical Engineers. Part III: Power Apparatus and Systems.