Scheduling of continuous and discontinuous material flows with intermediate storage restrictions
暂无分享,去创建一个
[1] Philippe Laborie,et al. Algorithms for propagating resource constraints in AI planning and scheduling: Existing approaches and new results , 2003, Artif. Intell..
[2] I. Grossmann,et al. MINLP model for cyclic multiproduct scheduling on continuous parallel lines , 1991 .
[3] G. V. Reklaitis,et al. Continuous Time Representation Approach to Batch and Continuous Process Scheduling. 2. Computational Issues , 1999 .
[4] Norbert Trautmann,et al. Batch scheduling in process industries: an application of resource–constrained project scheduling , 2000, OR Spectr..
[5] Jaime Cerdá,et al. An efficient MILP continuous-time formulation for short-term scheduling of multiproduct continuous facilities , 2002 .
[6] G. Reklaitis,et al. Continuous Time Representation Approach to Batch and Continuous Process Scheduling. 1. MINLP Formulation , 1999 .
[7] R.W.H. Sargent,et al. The optimal operation of mixed production facilities : extensions and improvements , 1998 .
[8] J. M. Pinto,et al. Optimal cyclic scheduling of multistage continuous multiproduct plants , 1994 .
[9] Eugeniusz Nowicki,et al. The permutation flow shop with buffers: A tabu search approach , 1999, Eur. J. Oper. Res..
[10] Ferdinand Blömer. Produktionsplanung und -steuerung in der chemischen Industrie , 1999 .
[11] N. Trautmann. Anlagenbelegungsplanung in der Prozeßindustrie , 2001 .
[12] Erwin Pesch,et al. A Survey of Interval Capacity Consistency Tests for Time- and Resource-Constrained Scheduling , 1999 .
[13] Gintaras V. Reklaitis,et al. Issues in the use, design and evolution of process scheduling and planning systems , 1997 .
[14] Christoph Schwindt. Minimizing Earliness-Tardiness Costs of Resource-Constrained Projects , 2000 .
[15] Rolf H. Möhring,et al. Resource constrained project scheduling with time windows: a branching scheme based on dynamic release dates (Technical Report 596-1998) , 1998 .
[16] Rolf H. Möhring,et al. Scheduling project networks with resource constraints and time windows , 1988 .
[17] In-Beum Lee,et al. Intermediate storage tank operation strategies in the production scheduling of multi-product batch processes , 2000 .
[18] Michael Pinedo,et al. Scheduling: Theory, Algorithms, and Systems , 1994 .
[19] F. Blomer,et al. LP-based heuristics for scheduling chemical batch processes , 2000 .
[20] Wolfgang Domschke,et al. Operations Research Proceedings 1999 , 2000 .
[21] J. M. Pinto,et al. A Continuous Time Mixed Integer Linear Programming Model for Short Term Scheduling of Multistage Batch Plants , 1995 .
[22] Professor Dr. Klaus Neumann,et al. Project Scheduling with Time Windows and Scarce Resources , 2003, Springer Berlin Heidelberg.
[23] P. Luh,et al. Job shop scheduling with group-dependent setups, finite buffers, and long time horizon , 1995, Proceedings of 1995 34th IEEE Conference on Decision and Control.
[24] J. M. Pinto,et al. Mixed-integer programming models for the scheduling and operational optimization of multiproduct continuous plants , 2002 .
[25] Jon Rigelsford,et al. Scheduling Computer and Manufacturing Processes 2nd Edition , 2002 .
[26] Norbert Trautmann,et al. Short-Term Planning of Batch Plants in Process Industries , 2001 .
[27] R. Sargent,et al. A general algorithm for short-term scheduling of batch operations */I , 1993 .
[28] Bert De Reyck,et al. A branch-and-bound procedure for the resource-constrained project scheduling problem with generalized precedence relations , 1998, Eur. J. Oper. Res..
[29] Klaus Neumann,et al. Project scheduling with inventory constraints , 2003, Math. Methods Oper. Res..
[30] Jan Węglarz,et al. Project scheduling : recent models, algorithms, and applications , 1999 .
[31] Christodoulos A. Floudas,et al. Effective Continuous-Time Formulation for Short-Term Scheduling. 2. Continuous and Semicontinuous Processes , 1998 .