A manufacturing and remanufacturing aggregate planning model considering a non-linear supply function of recovered products

Abstract: This article addresses the joint aggregate planning of a system for manufacturing new units and remanufacturing used units to obtain items that are indistinguishable from the original product. A variety of used conditions are taken into account. A forecast of the number of items at the end of their useful life in each period is assumed to be available and the proportion of items that are returned is a non-linear function of the price paid for them. The case deals with products such as copiers, printers and scanners, and with containers that require a complex refilling process. A mathematical program is obtained whose constraints and objective function have non-linear terms that are linearised by means of piecewise functions. The solution of several instances is addressed and one example is examined in detail.

[1]  Albert Corominas,et al.  Optimal manufacturing-remanufacturing policies in a lean production environment , 2008, Comput. Ind. Eng..

[2]  Monique L. French,et al.  Closed-loop supply chains in process industries: An empirical study of producer re-use issues , 2006 .

[3]  Simone Zanoni,et al.  Cost performance and bullwhip effect in a hybrid manufacturing and remanufacturing system with different control policies , 2006 .

[4]  V. Daniel R. Guide,et al.  Building contingency planning for closed-loop supply chains with product recovery , 2003 .

[5]  Vaidyanathan Jayaraman,et al.  Production planning for closed-loop supply chains with product recovery and reuse: an analytical approach , 2006 .

[6]  Daoud Aït-Kadi,et al.  Conceptual framework for the design and management of value loops – application to a wheelchair allocation context , 2009 .

[7]  Hokey Min,et al.  The spatial and temporal consolidation of returned products in a closed-loop supply chain network , 2006, Comput. Ind. Eng..

[8]  Samir K. Srivastava Value recovery network design for product returns , 2008 .

[9]  Jim Browne,et al.  Issues in end-of-life product recovery and reverse logistics , 2001 .

[10]  K. Inderfurth Simple optimal replenishment and disposal policies for a product recovery system with leadtimes , 1997 .

[11]  Ruud H. Teunter,et al.  Multi-product economic lot scheduling problem with separate production lines for manufacturing and remanufacturing , 2008, Eur. J. Oper. Res..

[12]  Benita M. Beamon,et al.  Supply-chain network configuration for product recovery , 2004 .

[13]  Sameer Kumar,et al.  Cradle to cradle: Reverse logistics strategies and opportunities across three industry sectors , 2008 .

[14]  S. Seuring,et al.  End-of-life returns of long-lived products from end customer—insights from an ideally set up closed-loop supply chain , 2007 .

[15]  Sergio Rubio,et al.  Characteristics of the research on reverse logistics (1995–2005) , 2008 .

[16]  Patrick Beullens,et al.  Closed-loop supply chain network equilibrium under legislation , 2007, Eur. J. Oper. Res..

[17]  Simme Douwe P. Flapper,et al.  Future developments in managing closed-loop supply chains , 2005 .

[18]  Simme Douwe P. Flapper,et al.  Managing closed-loop supply chains , 2005 .

[19]  P. C. Schuur,et al.  Business case Océ: Reverse logistic network re-design for copiers , 1999 .

[20]  V. Guide Production planning and control for remanufacturing: industry practice and research needs , 2000 .

[21]  Marisa de Brito,et al.  Managing Product Returns: The Role of Forecasting , 2004 .

[22]  Luk N. Van Wassenhove,et al.  Closed - Loop Supply Chain Models with Product Remanufacturing , 2004, Manag. Sci..

[23]  P. Sasikumar,et al.  Issues in reverse supply chains, part I: end‐of‐life product recovery and inventory management – an overview , 2008 .

[24]  Joseph Sarkis Manufacturing’s role in corporate environmental sustainability ‐ Concerns for the new millennium , 2001 .