Simulation based Design for Materials Delivery System of Engineering Machinery Assembly Line
暂无分享,去创建一个
[1] Wonjoon Choi,et al. A dynamic part-feeding system for an automotive assembly line , 2002 .
[2] F. Chana,et al. Analysis of dynamic dispatching rules for a flexible manufacturing system , 2015 .
[3] Andrea Matta,et al. Analysis of assembly systems controlled with kanbans , 2005, Eur. J. Oper. Res..
[4] Denis Borenstein,et al. Real-time vehicle rerouting problems with time windows , 2009, Eur. J. Oper. Res..
[5] Pius J. Egbelu,et al. Design of a variable path tandem layout for automated guided vehicle systems , 2001 .
[6] Jaejin Jang,et al. Vehicle Travel Time Models for AGV Systems under Various Dispatching Rules , 2002 .
[7] Daria Battini,et al. Design of the optimal feeding policy in an assembly system , 2009 .
[8] Satya S. Chakravorty,et al. Improving distribution operations: Implementation of material handling systems , 2009 .
[9] Zang Xiao-ning. Workstation-oriented production logistics distribution optimization , 2009 .
[10] André Langevin,et al. Integrated production and material handling scheduling using mathematical programming and constraint programming , 2003, Eur. J. Oper. Res..
[11] Nils Boysen,et al. Optimally locating in-house logistics areas to facilitate JIT-supply of mixed-model assembly lines , 2012 .
[12] J. Zhang,et al. An adaptive multi-parameter based dispatching strategy for single-loop interbay material handling systems , 2011, Comput. Ind..
[13] Chelliah Sriskandarajah,et al. Design and operational issues in AGV-served manufacturing systems , 1998, Ann. Oper. Res..
[14] Chwen‐Tzeng Su. Dynamic vehicle control and scheduling of a multi‐depot physical distribution system , 1999 .
[15] Erhan Kozan. An integrated material handling system for a truck assembly plant , 2000, J. Oper. Res. Soc..