Some Influencing Factors For Passenger Train Punctuality In Sweden
暂无分享,去创建一个
[1] Otto Anker Nielsen,et al. Causal Analysis of Railway Running Delays , 2016 .
[2] Aditya Parida,et al. Infrastructure Robustness for Railway Systems , 2015 .
[4] Brian Caulfield,et al. Weather and rail delays: Analysis of metropolitan rail in Dublin , 2017 .
[5] G. Dewulf,et al. Risk Assessment Of Climate Change Impacts On Railway Infrastructure , 2013 .
[6] Piet Rietveld,et al. Railway infrastructure disturbances and train operator performance: The role of weather , 2013 .
[7] Jörn Pachl,et al. Railway Operation and Control , 2002 .
[8] I. A. Hansen,et al. System analysis of train operations and track occupancy at railway stations , 2005 .
[9] Frequency analysis of critical meteorological conditions in a changing climate , 2016 .
[10] Johanna Törnquist Krasemann,et al. Reduced railway traffic delays using a MILP approach to increase Robustness in Critical Points , 2015, J. Rail Transp. Plan. Manag..
[11] Michael F. Gorman,et al. Statistical estimation of railroad congestion delay , 2009 .
[12] Ilari Lehtonen. Four consecutive snow‐rich winters in Southern Finland: 2009/2010–2012/2013 , 2015 .
[13] Nima Tahvili. Winterization of Railways - Issues and Effects , 2016 .
[14] M. H. van der Vlerk,et al. Optimizing existing railway timetables by means of stochastic programming , 2012 .
[15] I. A. Hansen,et al. Optimizing capacity utilization of stations by estimating knock-on train delays , 2007 .
[16] Nils O.E. Olsson,et al. Influencing factors on train punctuality—results from some Norwegian studies , 2004 .
[17] Csaba Csiszár,et al. Analysis of Delay Causes in Railway Passenger Transportation , 2015 .
[18] Nils O.E. Olsson,et al. Punktlighet i jernbanen - hvert sekund teller , 2015 .
[19] Uday Kumar,et al. Railway Assets: A Potential Domain for Big Data Analytics , 2015, INNS Conference on Big Data.
[20] Anita Schöbel,et al. A Bicriteria Approach for Robust Timetabling , 2009, Robust and Online Large-Scale Optimization.
[21] Aditya Parida,et al. Development of an integrity index for benchmarking and monitoring rail infrastructure: application of composite indicators , 2015 .
[22] Gerben M. Scheepmaker,et al. The interplay between energy-efficient train control and scheduled running time supplements , 2015, J. Rail Transp. Plan. Manag..
[23] Frank Schultmann,et al. Adapting rail and road networks to weather extremes: case studies for southern Germany and Austria , 2014, Natural Hazards.
[24] Nils O.E. Olsson,et al. Punctuality problems from the perspective of timetable planners in Sweden , 2017 .
[25] Lee Chapman,et al. The impacts of the 28 June 2012 storms on UK road and rail transport , 2015 .
[26] Nils O.E. Olsson,et al. Infrastructure’s Influence on Rail Punctuality , 2007 .
[27] Dirk Cattrysse,et al. Robust railway station planning: An interaction between routing, timetabling and platforming , 2013, J. Rail Transp. Plan. Manag..
[28] P. Rietveld,et al. Coping with unreliability in public transport chains: a case study for The Netherlands , 2001 .
[29] I. A. Hansen,et al. Railway Network Timetabling and Dynamic Traffic Management , 2009 .
[30] Otto Anker Nielsen,et al. Passenger Perspectives in Railway Timetabling: A Literature Review , 2016 .
[31] Inge Vierth,et al. Regress - en god idé i järnvägssektorn? , 2015 .
[32] Ronny Klæboe,et al. Extreme weather impacts on freight railways in Europe , 2013, Natural Hazards.
[33] Johanna Törnquist Krasemann,et al. Quantifying railway timetable robustness in critical points , 2013, J. Rail Transp. Plan. Manag..
[34] Xiaoliang Ma,et al. A stochastic process approach for modeling arrival delay in train operations , 2017 .
[35] Bo-Lennart Nelldal,et al. Kapacitetsanalys av järnvägsnätet i Sverige : Delrapport 1, Hur många tåg kan man köra? En analys av teoretisk och praktisk kapacitet , 2009 .
[36] Francesco Corman,et al. Analyzing Railway Disruptions and Their Impact on Delayed Traffic in Chinese High-Speed Railway , 2016 .
[37] Nils O.E. Olsson,et al. An Empirical Study of Timetable Strategies and Their Effects on Punctuality , 2017 .
[38] Emma Andersson. Assessment of Robustness in Railway Traffic Timetables , 2014 .
[39] Lee Chapman,et al. Heat-Related Failures on Southeast England’s Railway Network: Insights and Implications for Heat Risk Management , 2016 .
[40] Michiel Vromans,et al. Reliability of Railway Systems , 2005 .
[41] Malachy Carey,et al. Ex ante heuristic measures of schedule reliability , 1999 .
[42] N. Olsson,et al. Investigation of punctuality of local trains - the case of Oslo area , 2017 .
[43] Malachy Carey. Optimizing scheduled times, allowing for behavioural response , 1998 .
[44] Hansoo Kim,et al. Types of Train Delay of High-Speed Rail : Indicators and Criteria for Classification , 2013 .
[45] Ingo A. Hansen,et al. Closed Form Expressions of Optimal Buffer Times between Scheduled Trains at Railway Bottlenecks , 2008, 2008 11th International IEEE Conference on Intelligent Transportation Systems.
[46] Daniele Frigioni,et al. Recoverable robust timetabling for single delay: Complexity and polynomial algorithms for special cases , 2009, J. Comb. Optim..