Helium turbomachinery operating experience from gas turbine power plants and test facilities

Abstract The closed-cycle gas turbine, pioneered and deployed in Europe, is not well known in the USA. Since nuclear power plant studies currently being conducted in several countries involve the coupling of a high temperature gas-cooled nuclear reactor with a helium closed-cycle gas turbine power conversion system, the experience gained from operated helium turbomachinery is the focus of this paper. A study done as early as 1945 foresaw the use of a helium closed-cycle gas turbine coupled with a high temperature gas-cooled nuclear reactor, and some two decades later this was investigated but not implemented because of lack of technology readiness. However, the first practical use of helium as a gas turbine working fluid was recognized for cryogenic processes, and the first two small fossil-fired helium gas turbines to operate were in the USA for air liquefaction and nitrogen production facilities. In the 1970's a larger helium gas turbine plant and helium test facilities were built and operated in Germany to establish technology bases for a projected future high efficiency large nuclear gas turbine power plant concept. This review paper covers the experience gained, and the lessons learned from the operation of helium gas turbine plants and related test facilities, and puts these into perspective since over three decades have passed since they were deployed. An understanding of the many unexpected events encountered, and how the problems, some of them serious, were resolved is important to avoid them being replicated in future helium turbomachines. The valuable lessons learned in the past, in many cases the hard way, particularly from the operation in Germany of the Oberhausen II 50 MWe helium gas turbine plant, and the technical know-how gained from the formidable HHV helium turbine test facility, are viewed as being germane in the context of current helium turbomachine design work being done for future high efficiency nuclear gas turbine plant concepts.

[1]  Colin G. McDonald Power Conversion System Considerations for an Advanced Nuclear Gas Turbine (GT-VHTR) CHHP Demonstration Plant Concept , 2010 .

[2]  G. H. Lohnert,et al.  Technical design features and essentiaL safety-related properties of the HTR-module , 1990 .

[3]  G. E. Lockett,et al.  DRAGON PROJECT ENGINEERING STUDIES ON THE DIRECT CYCLE HTR. , 1970 .

[4]  C. Mcdonald The nuclear closed-cycle gas turbine /GT-HTGR/ - A utility power plant for the year 2000 , 1978 .

[5]  Xing Yan,et al.  389. 高温ガス炉ガスタービン発電システム(GTHTR300)用ヘリウムガス圧縮機モデルの空力性能試験計画 , 2003 .

[6]  G. Deuster,et al.  Layout and Present Status of the Closed-Cycle Helium Turbine Plant Oberhausen , 1974 .

[7]  K. Bammert,et al.  Status Report on Closed-Cycle Power Plants in the Federal Republic of Germany , 1976 .

[8]  Fabrice Bentivoglio,et al.  Validation of the CATHARE2 code against experimental data from Brayton-cycle plants , 2008 .

[9]  H. Haselbacher,et al.  Cooling and insulating problems in a high temperature helium test facility , 1984 .

[10]  Ronald H. Aungier Axial-Flow Compressors , 2003 .

[11]  Colin F. McDonald Helium and Combustion Gas Turbine Power Conversion Systems Comparison , 1995 .

[12]  John A. Bailey,et al.  Status of the Army Closed-Brayton-Cycle Gas Turbine Program , 1967 .

[13]  Colin F. McDonald,et al.  Turbomachinery Design Considerations for the Nuclear HTGR-GT Power Plant , 1980 .

[14]  Michel Lecomte,et al.  ANTARES: The HTR/VHTR project at Framatome ANP , 2006 .

[15]  Kazuhiko Kunitomi,et al.  R&D on the power conversion system for gas turbine high temperature reactors , 2004 .

[16]  Karl Prof Dr Ing Bammert,et al.  Operation and Control of the 50-Mw Closed-Cycle Helium Turbine Oberhausen , 1974 .

[17]  Kazuhiko Kunitomi,et al.  GTHTR300 design and development , 2003 .

[18]  Curt Keller Operating Experience and Design Features of Closed Cycle Gas Turbine Power Plants , 1956 .

[19]  Claus Grupen,et al.  Nuclear Power Plants , 2010 .

[20]  J. Yampolsky,et al.  Steam-Turbine-Driven Circulators for High-Temperature Gas-Cooled Reactors—Part II: Development , 1974 .

[21]  Lionel S. Marks,et al.  The theory and performance of axial-flow fans , 1937 .

[22]  L. Cavallaro,et al.  Design and development of a steam turbine driven circulator for high temperature gas-cooled reactors , 1974 .

[23]  O. E. Baljé,et al.  Turbomachines—A Guide to Design Selection and Theory , 1981 .

[24]  Hee Cheon No,et al.  A REVIEW OF HELIUM GAS TURBINE TECHNOLOGY FOR HIGH-TEMPERATURE GAS-COOLED REACTORS , 2007 .

[25]  Kazuhiko Kunitomi,et al.  Aerodynamic Design, Model Test, and CFD Analysis for a Multistage Axial Helium Compressor , 2008 .

[26]  Colin F. McDonald,et al.  Circulator Design/Technology Evolution for Gas-Cooled Nuclear Reactors , 1992 .

[27]  A. Telengator,et al.  Rotor scale model tests for power conversion unit of GT-MHR , 2012 .

[28]  Gunter H. Lohnert,et al.  The Modular High-Temperature Reactor , 1983 .

[29]  A. Koster,et al.  PBMR design for the future , 2003 .

[30]  C. F. McDonald,et al.  Helium turbomachine design for GT-MHR power plant , 1994 .

[31]  James K. La Fleur Description of an Operating Closed Cycle: Helium Gas Turbine , 1963 .

[32]  C. A. Rennie Achievements of the Dragon project , 1978 .

[33]  John L. Mason,et al.  5 MW Closed Cycle Gas Turbine , 1984 .

[34]  J. Donaldson Application of Magnetic Bearings to Helium Circulators for High Temperature Gas Cooled Reactors , 1987 .

[35]  C. F. McDonald,et al.  The Nuclear Gas Turbine-A Perspective on a Long-Term Advanced Technology HTGR Plant Option , 1982 .

[36]  Colin F. McDonald,et al.  The Nuclear Gas Turbine: Towards Realization After Half a Century of Evolution , 1995 .