Calculation of longitudinal bending moment and shear force for Shanghai Yangtze River Tunnel: Application of lessons from Dutch research
暂无分享,去创建一个
[1] Adam Bezuijen,et al. Tunnelling. A Decade of Progress. GeoDelft 1995-2005 , 2006 .
[2] Zhu Wei,et al. Effect of joint structure on joint stiffness for shield tunnel lining , 2006 .
[3] Yong Yuan,et al. Shanghai Yangtze River Tunnel Stability against Uplift during Tail Void Grouting , 2009 .
[4] A. M. Talmon A. Bezuijen. Backfill grouting research at Groene Hart Tunnel , 2008 .
[5] Adam Bezuijen,et al. FIELD MEASUREMENTS OF GROUT PRESSURES DURING TUNNELLING OF THE SOPHIA RAIL TUNNEL , 2004 .
[6] Adam Bezuijen,et al. Simulating the consolidation of TBM grout at Noordplaspolder , 2009 .
[7] F. Emeriault,et al. Stability analysis of large slurry shield-driven tunnel in soft clay , 2009 .
[8] J N Shirlaw,et al. Recent experience in automatic tail void grouting with soft ground tunnel boring machines , 2004 .
[9] F Hoefsloot,et al. 4D grouting pressure model PLAXIS , 2006 .
[10] Adam Bezuijen,et al. Analytical model for the beam action of a tunnel lining during construction , 2013 .
[11] R. Huang. Overview of ShanghaiYangtze River Tunnel Project , 2008 .
[12] S. Shen,et al. Analysis of shearing effect on tunnel induced by load transfer along longitudinal direction , 2008 .