Assessment of Power System Reliability
暂无分享,去创建一个
[1] N. S. Babu,et al. Analytical solution for combined economic and emissions dispatch , 2008 .
[2] George E Apostolakis,et al. A Screening Methodology for the Identification and Ranking of Infrastructure Vulnerabilities Due to Terrorism , 2005, Risk analysis : an official publication of the Society for Risk Analysis.
[3] J. Vaurio. Optimization of test and maintenance intervals based on risk and cost , 1995 .
[4] George J. Anders,et al. Probability Concepts in Electric Power Systems , 1990 .
[5] Roy Billinton,et al. Reliability Assessment of Large Electric Power Systems , 1988 .
[6] H Lee Willis,et al. Understanding Electric Utilities and De-Regulation , 1998 .
[7] D. Ogden,et al. Reliability block diagram simulation techniques applied to the IEEE Std. 493 standard network , 2004, IEEE Transactions on Industry Applications.
[8] R. Bharathi,et al. Optimization of combined economic and emission dispatch problem — A comparative study , 2007, 2007 International Power Engineering Conference (IPEC 2007).
[9] Sofía Carlos,et al. Constrained optimization of test intervals using a steady-state genetic algorithm , 2000, Reliab. Eng. Syst. Saf..
[10] Yasuhiro Hayashi,et al. An algorithm for thermal unit maintenance scheduling through combined use of GA, SA and TS , 1997 .
[11] Yansong Ren,et al. Design of reliable systems using static and dynamic fault trees , 1998 .
[12] W. Cedeño. The multi-niche crowding genetic algorithm: Analysis and applications , 1995 .
[13] O. Alsaç,et al. DC Power Flow Revisited , 2009, IEEE Transactions on Power Systems.
[14] Marko Cepina. Application of common cause analysis for assessment of reliability of power systems , 2010, 2010 IEEE 11th International Conference on Probabilistic Methods Applied to Power Systems.
[15] Hua Chen,et al. Generating system reliability optimization , 2000 .
[16] X. Wang,et al. Modern power system planning , 1994 .
[17] Ali A. Chowdhury,et al. Power Distribution System Reliability: Practical Methods and Applications , 2009 .
[18] Tunc Aldemir,et al. Optimization of standby safety system maintenance schedules in nuclear power plants , 1996 .
[19] R. Billinton,et al. Delivery point reliability indices of a bulk electric system using sequential Monte Carlo simulation , 2006, IEEE Transactions on Power Delivery.
[20] Luca Maria Gambardella,et al. Ant colony system: a cooperative learning approach to the traveling salesman problem , 1997, IEEE Trans. Evol. Comput..
[21] H. M. Merrill,et al. Power plant maintenance scheduling: optimizing economics and reliability , 1991 .
[22] L. Lakshminarasimman,et al. A modified hybrid differential evolution for short-term scheduling of hydrothermal power systems with cascaded reservoirs , 2008 .
[23] Michiyuki Kobayashi,et al. GO-FLOW: A New Reliability Analysis Methodology , 1988 .
[24] Hans-Paul Schwefel,et al. Evolution and optimum seeking , 1995, Sixth-generation computer technology series.
[25] Norman J. McCormick,et al. Reliability and Risk Analysis , 1981, IEEE Transactions on Reliability.
[26] Marko Cepin. DEPEND-HRA - A method for consideration of dependency in human reliability analysis , 2008, Reliab. Eng. Syst. Saf..
[27] Dimitri P. Bertsekas,et al. Dynamic Programming and Optimal Control, Two Volume Set , 1995 .
[28] R. A. Bari,et al. Probabilistic safety analysis procedures guide , 1984 .
[29] Roy Billinton,et al. Reliability evaluation of power systems , 1984 .
[30] E. Lofgren,et al. Interim Reliability Evaluation Program procedures guide , 1983 .
[31] P.V.N. Prasad,et al. Reliability evaluation of automated radial distribution system , 2010, 2010 IEEE 11th International Conference on Probabilistic Methods Applied to Power Systems.
[32] John D. Andrews,et al. An ordering heuristic to develop the binary decision diagram based on structural importance , 2001, Reliab. Eng. Syst. Saf..
[33] Franz Rothlauf,et al. Representations for genetic and evolutionary algorithms , 2002, Studies in Fuzziness and Soft Computing.
[34] Sheldon B. Akers,et al. Binary Decision Diagrams , 1978, IEEE Transactions on Computers.
[35] Joon-Eon Yang,et al. Optimization of the Surveillance Test Interval of the Safety Systems at the Plant Level , 2000 .
[36] John H. Holland,et al. Adaptation in Natural and Artificial Systems: An Introductory Analysis with Applications to Biology, Control, and Artificial Intelligence , 1992 .
[37] A. E. Eiben,et al. Introduction to Evolutionary Computing , 2003, Natural Computing Series.
[38] B. Mavko,et al. Probabilistic safety assessment improves surveillance requirements in technical specifications , 1997 .
[39] Malabika Basu,et al. Dynamic economic emission dispatch using nondominated sorting genetic algorithm-II , 2008 .
[40] Bernd Bertsche,et al. Fault Tree Analysis, FTA , 2008 .
[41] A. M. Leite da Silva,et al. Frequency and duration calculations in composite generation and transmission reliability evaluation , 1992 .
[43] Blas Galván,et al. Use of multiple objective evolutionary algorithms in optimizing surveillance requirements , 2006, Reliab. Eng. Syst. Saf..
[44] J. K. Vaurio,et al. Modelling the loss and recovery of electric power , 1995 .
[45] Randy L. Haupt,et al. Practical Genetic Algorithms , 1998 .
[46] M. A. Abido,et al. Multiobjective particle swarm optimization for environmental/economic dispatch problem , 2009 .
[47] Melanie Mitchell,et al. An introduction to genetic algorithms , 1996 .
[48] T. P. Benthall. Automatic load scheduling in a multiarea power system , 1968 .
[49] Borut Mavko,et al. Power System Reliability Analysis Using Fault Trees , 2006 .
[50] Robert Castelo,et al. Learning Essential Graph Markov Models From Data , 2002, Probabilistic Graphical Models.
[51] Richard S. J. Tol,et al. An Estimate of the Value of Lost Load for Ireland , 2011 .
[52] Celso Marcelo Franklin Lapa,et al. Surveillance test policy optimization through genetic algorithms using non-periodic intervention frequencies and considering seasonal constraints , 2003, Reliab. Eng. Syst. Saf..
[53] Balbir S. Dhillon,et al. Applied Reliability and Quality , 2007 .
[54] Mohammad Shahidehpour,et al. The IEEE Reliability Test System-1996. A report prepared by the Reliability Test System Task Force of the Application of Probability Methods Subcommittee , 1999 .
[55] A. M. Leite da Silva,et al. Frequency and duration method for reliability evaluation of large-scale hydrothermal generating systems , 1991 .
[56] N.D. Reppen,et al. Increasing utilization of the transmission grid requires new reliability criteria and comprehensive reliability assessment , 2005, 2004 International Conference on Probabilistic Methods Applied to Power Systems.
[57] Malcolm Irving,et al. Multipartitioning of power system state estimation networks using simulated annealing , 1995 .
[58] Mo-Yuen Chow,et al. Phase balancing using simulated annealing , 1999 .
[59] Allen J. Wood,et al. Power Generation, Operation, and Control , 1984 .
[60] P. O'Connor,et al. Practical Reliability Engineering , 1981 .
[61] Michael N. Vrahatis,et al. Recent approaches to global optimization problems through Particle Swarm Optimization , 2002, Natural Computing.
[62] Paul Pukite,et al. Modeling for Reliability Analysis , 1998 .
[63] R. C. Winton,et al. An elementary guide to reliability , 1968 .
[64] J.F. Dopazo,et al. Optimal generator maintenance scheduling using integer programming , 1975, IEEE Transactions on Power Apparatus and Systems.
[65] Marko Cepin,et al. Optimization of safety equipment outages improves safety , 2002, Reliab. Eng. Syst. Saf..
[66] Wenyuan Li,et al. Risk Assessment Of Power Systems: Models, Methods, and Applications , 2004 .
[67] Ronald Allen Knief,et al. Nuclear engineering : theory and technology of commercial nuclear power , 2008 .
[68] M. T. Drouin,et al. Analysis of core damage frequency: Internal events methodology , 1990 .
[69] Randal E. Bryant,et al. Graph-Based Algorithms for Boolean Function Manipulation , 1986, IEEE Transactions on Computers.
[70] R. Bellman. Dynamic programming. , 1957, Science.
[71] Mohammad Modarres,et al. A historical overview of probabilistic risk assessment development and its use in the nuclear power industry: a tribute to the late Professor Norman Carl Rasmussen , 2005, Reliab. Eng. Syst. Saf..
[72] M. Padberg,et al. Linear Optimization and Extensions: Problems and Solutions , 2001 .
[73] Eduardo N. Asada,et al. Critical evaluation of direct and iterative methods for solving Ax=b systems in power flow calculations and contingency analysis , 1999 .
[74] W. E. Vesely,et al. Two measures of risk importance and their application , 1985 .
[75] Leon Cizelj,et al. Vulnerability Analysis of a Nuclear Power Plant Considering Detonations of Explosive Devices , 2006 .
[76] N VijayamohananPillai,et al. Loss of load probability of a power system : Kerala , 2008 .
[77] Alexander Schrijver,et al. Theory of linear and integer programming , 1986, Wiley-Interscience series in discrete mathematics and optimization.
[78] Swedpower Ab,et al. T-book. Reliability data of components in Nordic nuclear power plants. 6. ed , 2005 .
[79] Rajesh U Nighot. Incorporating Substation and Switching Station Related Outages in Composite System Reliability Evaluation , 2003 .
[80] Marko Cepin. The risk criteria for assessment of temporary changes in a nuclear power plant. , 2007, Risk analysis : an official publication of the Society for Risk Analysis.
[81] Ian Dobson,et al. Evidence for self-organized criticality in electric power system blackouts , 2001, Proceedings of the 34th Annual Hawaii International Conference on System Sciences.
[82] J. Bert Keats,et al. EVALUATING COMPLEX SYSTEM RELIABILITY USING RELIABILITY BLOCK DIAGRAM SIMULATION WHEN LITTLE OR NO FAILURE DATA ARE AVAILABLE , 2000 .
[83] N. Metropolis,et al. Equation of State Calculations by Fast Computing Machines , 1953, Resonance.
[84] T. Miki,et al. Development of a hybrid type assessment method for power system dynamic reliability , 1999, IEEE SMC'99 Conference Proceedings. 1999 IEEE International Conference on Systems, Man, and Cybernetics (Cat. No.99CH37028).
[85] Jean-Claude Laprie,et al. Software-based critical systems , 1996, SAFECOMP.
[86] Ondrej Lhoták,et al. Program analysis using binary decision diagrams , 2006 .
[87] R. Durrett. Probability: Theory and Examples , 1993 .
[88] Joanne Bechta Dugan. Automated analysis of phased-mission reliability , 1991 .
[89] Ting-Yu Chen,et al. Efficiency improvement of simulated annealing in optimal structural designs , 2002 .
[90] Suzannah Yin Wa Wong,et al. An enhanced simulated annealing approach to unit commitment , 1998 .
[91] James J. Burke,et al. Power Distribution Engineering: Fundamentals and Applications , 1994 .
[92] Igor Rychlik,et al. Probability and Risk Analysis: An Introduction for Engineers , 2006 .
[93] H Lee Willis,et al. Spatial electric load forecasting , 1996 .
[94] D. L. Kelly,et al. Evaluation of Loss of Offsite Power Events at Nuclear Power Plants: 1980 - 1996 , 1999 .
[95] Mohamed A. El-Sharkawi,et al. Modern heuristic optimization techniques :: theory and applications to power systems , 2008 .
[96] Ioannis A. Papazoglou. Mathematical Foundations of Event Trees , 1998 .
[97] Alireza Khotanzad,et al. Power System Planning (Reliability) , 2000 .
[98] Ronald N. Allan,et al. Probabilistic analysis of power flows , 1974 .
[99] Borut Mavko,et al. Genetic algorithm optimisation of the maintenance scheduling of generating units in a power system , 2008, Reliab. Eng. Syst. Saf..
[100] Borut Mavko,et al. Application of the fault tree analysis for assessment of power system reliability , 2009, Reliab. Eng. Syst. Saf..
[101] Yuan-Shun Way,et al. A simple component-connection method for building binary decision diagrams encoding a fault tree , 2000, Reliab. Eng. Syst. Saf..
[102] Christopher M. Bishop,et al. Neural networks for pattern recognition , 1995 .
[103] Arash Habibi Lashkari,et al. Binary Decision Diagram (BDD) , 2009, 2009 International Conference on Future Computer and Communication.
[104] Alessandro Birolini. Reliability Engineering: Theory and Practice , 1999 .
[105] Robert B. Litterman. A random walk, Markov model for the distribution of time series , 1983 .
[106] Yuan-Shun Dai,et al. Computing systems reliability - models and analysis , 2004 .
[107] D. W. Wells,et al. Method for economic secure loading of a power system , 1968 .
[108] Borut Mavko,et al. A dynamic fault tree , 2002, Reliab. Eng. Syst. Saf..
[109] Vivek S. Borkar,et al. Average Cost Dynamic Programming Equations For Controlled Markov Chains With Partial Observations , 2000, SIAM J. Control. Optim..
[110] W. R. Buckland,et al. A Guide to Probability Theory and Application , 1974 .
[111] F. Farmer. REACTOR SAFETY AND SITING: A PROPOSED RISK CRITERION. , 1967 .
[112] Jos Arrillaga,et al. High Voltage Direct Current Transmission , 2014 .
[113] S. Swaminathan,et al. The mathematical formulation for the event sequence diagram framework , 1999 .
[114] Giuseppe Calabrese,et al. Generating Reserve Capacity Determined by the Probability Method , 1947, Transactions of the American Institute of Electrical Engineers.
[115] Wenyuan Li,et al. A probabilistic planning approach to single circuit supply systems , 2010, 2010 IEEE 11th International Conference on Probabilistic Methods Applied to Power Systems.
[116] V. E. Lynch,et al. Critical points and transitions in an electric power transmission model for cascading failure blackouts. , 2002, Chaos.
[117] Nikola Rajaković,et al. Multiobjective programming in power system optimization: new approach to generator maintenance scheduling , 1994 .
[118] Ronaldus W. Meester. A Natural Introduction to Probability Theory , 2004 .
[119] Ana Sánchez,et al. Alternatives and challenges in optimizing industrial safety using genetic algorithms , 2004, Reliab. Eng. Syst. Saf..
[120] Ronald A. Howard,et al. Dynamic Probabilistic Systems , 1971 .
[121] Malabika Basu,et al. A simulated annealing-based goal-attainment method for economic emission load dispatch of fixed head hydrothermal power systems , 2005 .
[122] V. Madani,et al. Shedding light on blackouts , 2004, IEEE Power and Energy Magazine.
[123] L. Pereira,et al. Cascade to black [system blackouts] , 2004, IEEE Power and Energy Magazine.
[124] Ieee Standards Board,et al. IEEE guide to the collection and presentation of electrical, electronic, and sensing component reliability data for nuclear-power generating stations , 1977 .
[125] Mohamed E. El-Hawary,et al. Simulated annealing optimization algorithm for power systems quality analysis , 2004 .
[126] Yu-Shu Hu. Evaluating system behavior through dynamic master logic diagram modeling , 1995 .
[127] R. C. Settembrini,et al. Reliability and quality comparisons of electric power distribution systems , 1991, Proceedings of the 1991 IEEE Power Engineering Society Transmission and Distribution Conference.
[128] Monica S. Lam,et al. Context-sensitive pointer analysis using binary decision diagrams , 2007 .
[129] Liisa Pottonen,et al. A method for the probabilistic security analysis of transmission grids , 2005 .
[130] Richard Shelton Kirby. Engineering in History , 1956 .
[131] David Elmakias,et al. New Computational Methods in Power System Reliability , 2008, Studies in Computational Intelligence.
[132] Liisa Haarla,et al. A method for analysing the reliability of a transmission grid , 2008, Reliab. Eng. Syst. Saf..
[133] Mohammad Modarres,et al. Function-centered modeling of engineering systems using the goal tree–success tree technique and functional primitives , 1999 .
[134] Yifeng Li. Bulk system reliability evaluation in a deregulated power industry , 2003 .
[135] Borut Mavko,et al. Component reliability assessment using quantitative and qualitative data , 2001, Reliab. Eng. Syst. Saf..
[136] J. Momoh. Electric Power System Applications of Optimization , 2000 .
[137] W E Vesely,et al. Fault Tree Handbook , 1987 .
[138] Marko Čepin. Importance of human contribution within the human reliability analysis (IJS-HRA) , 2008 .
[139] C.-L. Sandblom,et al. Linear Programming and its Applications , 2007 .
[140] Thomas A. Short,et al. Distribution Reliability and Power Quality , 2005 .
[141] Marko Cepin. Analysis of truncation limit in probabilistic safety assessment , 2005, Reliab. Eng. Syst. Saf..
[142] Joachim Zietz. Dynamic Programming: An Introduction by Example , 2007 .
[143] N. Siu,et al. Risk assessment for dynamic systems: An overview , 1994 .
[144] Kenneth Alan De Jong,et al. An analysis of the behavior of a class of genetic adaptive systems. , 1975 .
[145] David E. Goldberg,et al. Genetic Algorithms in Search Optimization and Machine Learning , 1988 .
[146] Richard E. Brown,et al. Electric Power Distribution Reliability , 2002 .
[147] Ali M. Rushdi. Symbolic Reliability Analysis with the Aid of Variable-Entered Karnaugh Maps , 1983, IEEE Transactions on Reliability.
[148] William F. Tinney,et al. Iterative Linear AC Power Flow Solution for Fast Approximate Outage Studies , 1972 .
[149] Kathryn A. Dowsland,et al. Simulated Annealing , 1989, Encyclopedia of GIS.
[150] Wei-Chang Yeh. An improved sum-of-disjoint-products technique for the symbolic network reliability analysis with known minimal paths , 2007, Reliab. Eng. Syst. Saf..
[151] Junichi Toyoda,et al. Optimal generating unit maintenance scheduling for multi-area system with network constraints , 1991 .
[152] J. Yellen,et al. Unit maintenance scheduling with fuel constraints , 1991 .
[153] David Williams,et al. Probability with Martingales , 1991, Cambridge mathematical textbooks.
[154] Robert J. Vanderbei,et al. Linear Programming: Foundations and Extensions , 1998, Kluwer international series in operations research and management service.
[155] Jay Yellen,et al. A decomposition approach to unit maintenance scheduling , 1992 .
[156] Hadi Saadat,et al. Power System Analysis , 1998 .
[157] D. O. Koval,et al. Development of transmission system reliability performance benchmarks , 1999, 1999 IEEE Industrial and Commercial Power Systems Technical Conference (Cat. No.99CH36371).
[158] Christoph Meinel,et al. Algorithms and Data Structures in VLSI Design: OBDD - Foundations and Applications , 2012 .
[159] Deepak Aswani,et al. Criteria for evaluating protection from single points of failure for partially expanded fault trees , 2008, Reliab. Eng. Syst. Saf..
[160] Hiroyuki Mori,et al. A preconditioned fast decoupled power flow method for contingency screening , 1995 .
[161] L. Breuer. Introduction to Stochastic Processes , 2022, Statistical Methods for Climate Scientists.
[162] Borut Mavko,et al. Nuclear power plant maintenance optimization , 2009 .
[163] Kit Po Wong,et al. Solving power system optimization problems using simulated annealing , 1995 .
[164] Paul Haley,et al. Super Decoupled Loadflow With Distributed Slack Bus , 1985, IEEE Transactions on Power Apparatus and Systems.
[165] J. Casazza,et al. Understanding electric power systems : an overview of the technology and the marketplace , 2003 .
[166] George E. Apostolakis,et al. Identification of critical locations across multiple infrastructures for terrorist actions , 2007, Reliab. Eng. Syst. Saf..
[167] M. Sniedovich. Dynamic programming : foundations and principles , 2011 .
[168] George B. Dantzig,et al. Linear Programming 1: Introduction , 1997 .
[169] John N. Tsitsiklis,et al. Introduction to Probability , 2002 .
[170] Luca Podofillini,et al. A combination of Monte Carlo simulation and cellular automata for computing the availability of complex network systems , 2006, Reliab. Eng. Syst. Saf..
[171] Robert A. W. van Amerongan. A general-purpose version of the fast decoupled load flow , 1989 .
[172] Bernd Gärtner,et al. Understanding and using linear programming , 2007, Universitext.
[173] Pradip Kumar Sadhu,et al. Deterministic and stochastic approach for safety and reliability optimization of captive power plant maintenance scheduling using GA/SA-based hybrid techniques: A comparison of results , 2007, Reliab. Eng. Syst. Saf..
[174] J. K. Vaurio,et al. An implicit method for incorporating common-cause failures in system analysis , 1998 .
[175] Homayoon Dezfuli,et al. Probabilistic Risk Assessment Procedures Guide for NASA Managers and Practitioners (Second Edition) , 2011 .
[176] Y. Aslan,et al. Solution to environmental economic power dispatch problems in hydrothermal power systems by using genetic algorithm , 2009, 2009 International Conference on Electrical and Electronics Engineering - ELECO 2009.
[177] Thomas L. Magnanti,et al. Applied Mathematical Programming , 1977 .
[178] H Lee Willis,et al. Aging Power Delivery Infrastructures , 2000 .
[179] M. Padberg. Linear Optimization and Extensions , 1995 .
[180] C. M. Shen,et al. Power-system load scheduling with security constraints using dual linear programming , 1970 .
[181] Ruey-Hsun Liang,et al. A Fuzzy-Optimization Approach for Generation Scheduling With Wind and Solar Energy Systems , 2007, IEEE Transactions on Power Systems.
[182] H. Tijms. Understanding Probability: Chance Rules in Everyday Life , 2004 .
[183] Nguyen Hoang Viet,et al. Automation and reliability improvement for distribution feeder , 2010, 2010 IEEE 11th International Conference on Probabilistic Methods Applied to Power Systems.
[184] Jizhong Zhu,et al. Optimization of Power System Operation , 2009 .
[185] Emanuele Borgonovo,et al. A new importance measure for risk-informed decision making , 2001, Reliab. Eng. Syst. Saf..
[186] N. Chakraborty,et al. Differential evolution technique-based short-term economic generation scheduling of hydrothermal systems , 2008 .
[187] David J Smith,et al. Reliability, Maintainability and Risk , 2013 .
[188] A. M. Leite da Silva,et al. A conditional probability approach to the calculation of frequency and duration indices in composite reliability evaluation , 1993 .
[189] P. K. Sen,et al. Costs of Adequacy and Reliability of Electric Power , 2006, 2006 38th North American Power Symposium.
[190] J. Toyoda,et al. Maintenance scheduling based on two level hierarchical structure to equalize incremental risk , 1989, Conference Papers Power Industry Computer Application Conference.
[191] Peter Kafka,et al. Probabilistic Risk Assessment for Nuclear Power Plants , 2008 .
[192] Zbigniew Michalewicz,et al. Evolutionary Algorithms in Engineering Applications , 1997, Springer Berlin Heidelberg.
[193] G.R. Burdick,et al. Phased Mission Analysis: A Review of New Developments and An Application , 1977, IEEE Transactions on Reliability.
[194] E. Handschin,et al. Integrated maintenance scheduling system for electrical energy systems , 1998 .
[195] C. D. Gelatt,et al. Optimization by Simulated Annealing , 1983, Science.
[196] Enrico Zio,et al. Optimizing maintenance and repair policies via a combination of genetic algorithms and Monte Carlo simulation , 2000, Reliab. Eng. Syst. Saf..
[197] Andres Ramos,et al. Goal programming approach to maintenance scheduling of generating units in large scale power systems , 1999 .
[198] Alexander Vardy,et al. Ordered Binary Decision Diagrams and Minimal Trellises , 1999, IEEE Trans. Computers.
[199] D.O. Koval,et al. Probabilistic assessment of transmission system reliability performance , 2006, 2006 IEEE Power Engineering Society General Meeting.
[200] Hiromitsu Kumamoto,et al. Probabilistic Risk Assessment and Management for Engineers and Scientists , 1996 .
[201] George E. Apostolakis,et al. The dynamic flowgraph methodology for assessing the dependability of embedded software systems , 1995, IEEE Trans. Syst. Man Cybern..
[202] Eric Hobson,et al. Power System Security Control Calculations Using Linear Programming, Part II , 1978, IEEE Transactions on Power Apparatus and Systems.
[203] Zia Yamayee,et al. Maintenance Scheduling: Description, Literature Survey, and Interface with Overall Operations Scheduling , 1982, IEEE Transactions on Power Apparatus and Systems.
[204] Michael R. Lyu,et al. System reliability analysis of an N-version programming application , 1994 .
[205] Y.J. Cao,et al. A novel multi-objective genetic algorithm for economic power dispatch , 2004, 39th International Universities Power Engineering Conference, 2004. UPEC 2004..
[206] John D. Andrews,et al. A fault tree analysis strategy using binary decision diagrams , 2002, Reliab. Eng. Syst. Saf..
[207] Beate Bollig,et al. Complexity Theoretical Results on Partitioned (Nondeterministic) Binary Decision Diagrams , 1997, Theory of Computing Systems.
[208] O. Alsac,et al. Fast Decoupled Load Flow , 1974 .
[209] Ronald A. Howard,et al. Dynamic Programming and Markov Processes , 1960 .
[210] Patrick Billingsley,et al. Probability and Measure. , 1986 .
[211] Elmer E Lewis,et al. Introduction To Reliability Engineering , 1987 .
[212] Costas Vournas,et al. An enhanced peak shaving method for short term hydrothermal scheduling , 2007 .
[213] Kaisa Simola,et al. Decision criteria in PSA applications , 2001 .
[214] Stan Kaplan,et al. Power Plants: Characteristics and Costs , 2008 .