Scheduling of single-arm cluster tools with multi-type wafers and shared PMs

As the wafer size increases and consumption demand changes, wafer fabrication mode tends to be multi-type and small-batch production. However, most of existing scheduling methods focus on the control problems of single wafer type, which is not suitable for the scheduling of multiple wafer types. With wafer residency time constraints considered, this paper concentrates on the scheduling and control problems of single-armed cluster tools with multi-type wafers and shared PMs. To balance workloads among processing steps, a virtual processing modules technology is adopted. According to the modified backward scheduling strategy, analytic expressions for testing schedulabilities are derived. Finally, a periodic scheduling algorithm for steady-state is presented. Meanwhile, illustrative examples are given to verify the feasibility and availability of the proposed algorithm.

[1]  MengChu Zhou,et al.  A Closed-Form Solution for Schedulability and Optimal Scheduling of Dual-Arm Cluster Tools With Wafer Residency Time Constraint Based on Steady Schedule Analysis , 2010, IEEE Transactions on Automation Science and Engineering.

[2]  Babak Hamidzadeh,et al.  Optimal scheduling techniques for cluster tools with process-module and transport-module residency constraints , 2001, Proceedings 2001 ICRA. IEEE International Conference on Robotics and Automation (Cat. No.01CH37164).

[3]  MengChu Zhou,et al.  Schedulability Analysis and Optimal Scheduling of Dual-Arm Cluster Tools With Residency Time Constraint and Activity Time Variation , 2012, IEEE Transactions on Automation Science and Engineering.

[4]  Chelliah Sriskandarajah,et al.  Scheduling in Dual Gripper Robotic Cells for Productivity Gains , 2001, IEEE Trans. Robotics Autom..

[5]  Jun-Ho Lee,et al.  Scheduling Lot Switching Operations for Cluster Tools , 2013, IEEE Transactions on Semiconductor Manufacturing.

[6]  Chihyun Jung,et al.  An Efficient Mixed Integer Programming Model Based on Timed Petri Nets for Diverse Complex Cluster Tool Scheduling Problems , 2012, IEEE Transactions on Semiconductor Manufacturing.

[7]  Tae-Eog Lee,et al.  Modeling and implementing a real-time scheduler for dual-armed cluster tools , 2001, Comput. Ind..

[8]  Yan Qiao,et al.  Scheduling and Analysis of Start-Up Transient Processes for Dual-Arm Cluster Tools With Wafer Revisiting , 2015, IEEE Transactions on Semiconductor Manufacturing.

[9]  Jun-Ho Lee,et al.  Scheduling Cluster Tools for Concurrent Processing of Two Wafer Types , 2014, IEEE Transactions on Automation Science and Engineering.

[10]  Tae-Eog Lee,et al.  Scheduling start-up and close-down periods of dual-armed cluster tools with wafer delay regulation , 2012 .

[11]  Feng Chu,et al.  A Petri Net Method for Schedulability and Scheduling Problems in Single-Arm Cluster Tools With Wafer Residency Time Constraints , 2008, IEEE Transactions on Semiconductor Manufacturing.

[12]  Tae-Eog Lee,et al.  A review of scheduling theory and methods for semiconductor manufacturing cluster tools , 2008, 2008 Winter Simulation Conference.

[13]  W.M. Zuberek,et al.  Cluster tools with chamber revisiting-modeling and analysis using timed Petri nets , 2004, IEEE Transactions on Semiconductor Manufacturing.

[14]  Babak Hamidzadeh,et al.  An optimal periodic scheduler for dual-arm robots in cluster tools with residency constraints , 2001, IEEE Trans. Robotics Autom..

[15]  MengChu Zhou,et al.  Petri Net Modeling and Wafer Sojourn Time Analysis of Single-Arm Cluster Tools With Residency Time Constraints and Activity Time Variation , 2012, IEEE Transactions on Semiconductor Manufacturing.

[16]  Tae-Eog Lee,et al.  Scheduling single-armed cluster tools with reentrant wafer flows , 2006 .

[17]  MengChu Zhou,et al.  Scheduling and Control of Startup Process for Single-Arm Cluster Tools With Residency Time Constraints , 2017, IEEE Transactions on Control Systems Technology.

[18]  MengChu Zhou,et al.  Petri Net Modeling and Scheduling of a Close-Down Process for Time-Constrained Single-Arm Cluster Tools , 2018, IEEE Transactions on Systems, Man, and Cybernetics: Systems.

[19]  Chelliah Sriskandarajah,et al.  Scheduling Multiple Parts in a Robotic Cell Served by a Dual-Gripper Robot , 2004, Oper. Res..

[20]  Eugene Levner,et al.  Multiple-part cyclic hoist scheduling using a sieve method , 1999, IEEE Trans. Robotics Autom..

[21]  Tae-Eog Lee,et al.  Schedulability Analysis of Time-Constrained Cluster Tools With Bounded Time Variation by an Extended Petri Net , 2008, IEEE Transactions on Automation Science and Engineering.

[22]  MengChu Zhou,et al.  Petri Net Modeling and Cycle-Time Analysis of Dual-Arm Cluster Tools With Wafer Revisiting , 2013, IEEE Transactions on Systems, Man, and Cybernetics: Systems.

[23]  S. Venkatesh,et al.  A steady-state throughput analysis of cluster tools: dual-blade versus single-blade robots , 1997 .

[24]  Oya Ekin Karasan,et al.  Multiple part-type scheduling in flexible robotic cells , 2012 .

[25]  Pengyu Yan,et al.  Optimal cyclic scheduling of a hoist and multi-type parts with fixed processing times , 2010 .

[26]  Jun-Ho Lee,et al.  Scheduling cluster tools for concurrent processing of two wafer types with PM sharing , 2015 .

[27]  Raghavan Srinivasan,et al.  Modeling and performance analysis of cluster tools using Petri nets , 1998 .

[28]  M.C. Fu,et al.  Optimal preventive maintenance scheduling in semiconductor manufacturing , 2004, IEEE Transactions on Semiconductor Manufacturing.