Scheduling of single-arm cluster tools with multi-type wafers and shared PMs
暂无分享,去创建一个
Yuan Zhou | Jipeng Wang | Chunrong Pan | Hesuan Hu | Chunrong Pan | Yuan Zhou | Hesuan Hu | Jipeng Wang
[1] MengChu Zhou,et al. A Closed-Form Solution for Schedulability and Optimal Scheduling of Dual-Arm Cluster Tools With Wafer Residency Time Constraint Based on Steady Schedule Analysis , 2010, IEEE Transactions on Automation Science and Engineering.
[2] Babak Hamidzadeh,et al. Optimal scheduling techniques for cluster tools with process-module and transport-module residency constraints , 2001, Proceedings 2001 ICRA. IEEE International Conference on Robotics and Automation (Cat. No.01CH37164).
[3] MengChu Zhou,et al. Schedulability Analysis and Optimal Scheduling of Dual-Arm Cluster Tools With Residency Time Constraint and Activity Time Variation , 2012, IEEE Transactions on Automation Science and Engineering.
[4] Chelliah Sriskandarajah,et al. Scheduling in Dual Gripper Robotic Cells for Productivity Gains , 2001, IEEE Trans. Robotics Autom..
[5] Jun-Ho Lee,et al. Scheduling Lot Switching Operations for Cluster Tools , 2013, IEEE Transactions on Semiconductor Manufacturing.
[6] Chihyun Jung,et al. An Efficient Mixed Integer Programming Model Based on Timed Petri Nets for Diverse Complex Cluster Tool Scheduling Problems , 2012, IEEE Transactions on Semiconductor Manufacturing.
[7] Tae-Eog Lee,et al. Modeling and implementing a real-time scheduler for dual-armed cluster tools , 2001, Comput. Ind..
[8] Yan Qiao,et al. Scheduling and Analysis of Start-Up Transient Processes for Dual-Arm Cluster Tools With Wafer Revisiting , 2015, IEEE Transactions on Semiconductor Manufacturing.
[9] Jun-Ho Lee,et al. Scheduling Cluster Tools for Concurrent Processing of Two Wafer Types , 2014, IEEE Transactions on Automation Science and Engineering.
[10] Tae-Eog Lee,et al. Scheduling start-up and close-down periods of dual-armed cluster tools with wafer delay regulation , 2012 .
[11] Feng Chu,et al. A Petri Net Method for Schedulability and Scheduling Problems in Single-Arm Cluster Tools With Wafer Residency Time Constraints , 2008, IEEE Transactions on Semiconductor Manufacturing.
[12] Tae-Eog Lee,et al. A review of scheduling theory and methods for semiconductor manufacturing cluster tools , 2008, 2008 Winter Simulation Conference.
[13] W.M. Zuberek,et al. Cluster tools with chamber revisiting-modeling and analysis using timed Petri nets , 2004, IEEE Transactions on Semiconductor Manufacturing.
[14] Babak Hamidzadeh,et al. An optimal periodic scheduler for dual-arm robots in cluster tools with residency constraints , 2001, IEEE Trans. Robotics Autom..
[15] MengChu Zhou,et al. Petri Net Modeling and Wafer Sojourn Time Analysis of Single-Arm Cluster Tools With Residency Time Constraints and Activity Time Variation , 2012, IEEE Transactions on Semiconductor Manufacturing.
[16] Tae-Eog Lee,et al. Scheduling single-armed cluster tools with reentrant wafer flows , 2006 .
[17] MengChu Zhou,et al. Scheduling and Control of Startup Process for Single-Arm Cluster Tools With Residency Time Constraints , 2017, IEEE Transactions on Control Systems Technology.
[18] MengChu Zhou,et al. Petri Net Modeling and Scheduling of a Close-Down Process for Time-Constrained Single-Arm Cluster Tools , 2018, IEEE Transactions on Systems, Man, and Cybernetics: Systems.
[19] Chelliah Sriskandarajah,et al. Scheduling Multiple Parts in a Robotic Cell Served by a Dual-Gripper Robot , 2004, Oper. Res..
[20] Eugene Levner,et al. Multiple-part cyclic hoist scheduling using a sieve method , 1999, IEEE Trans. Robotics Autom..
[21] Tae-Eog Lee,et al. Schedulability Analysis of Time-Constrained Cluster Tools With Bounded Time Variation by an Extended Petri Net , 2008, IEEE Transactions on Automation Science and Engineering.
[22] MengChu Zhou,et al. Petri Net Modeling and Cycle-Time Analysis of Dual-Arm Cluster Tools With Wafer Revisiting , 2013, IEEE Transactions on Systems, Man, and Cybernetics: Systems.
[23] S. Venkatesh,et al. A steady-state throughput analysis of cluster tools: dual-blade versus single-blade robots , 1997 .
[24] Oya Ekin Karasan,et al. Multiple part-type scheduling in flexible robotic cells , 2012 .
[25] Pengyu Yan,et al. Optimal cyclic scheduling of a hoist and multi-type parts with fixed processing times , 2010 .
[26] Jun-Ho Lee,et al. Scheduling cluster tools for concurrent processing of two wafer types with PM sharing , 2015 .
[27] Raghavan Srinivasan,et al. Modeling and performance analysis of cluster tools using Petri nets , 1998 .
[28] M.C. Fu,et al. Optimal preventive maintenance scheduling in semiconductor manufacturing , 2004, IEEE Transactions on Semiconductor Manufacturing.