Reduction of Life Cycle Costs for a Contemporary Helicopter through Improvement of Reliability and Maintainability Parameters

Purpose The modern helicopters are designed with maximum serviceability and long life expectancy to ensure minimum life cycle cost. In this study, a framework is presented to incorporate the customer requirements on reliability and maintainability parameters into the design and development phase of a contemporary helicopter and the way how to capture operational data to establish and improve the reliability and maintainability parameters to reduce life cycle cost is discussed. Design/methodology/approach From the analysis it is established that the reliability & maintainability cost is the major contributor for the life cost. The significant reliability & maintainability parameter which influence reliability and maintainability cost is identified from analysis. The operational and design data of a contemporary helicopter is collected, compiled and analyzed to establish and improve the reliability & maintainability parameter. Findings The process depicted in the paper is followed for a contemporary helicop...

[1]  F P E Glen Jurges Performance based simulation modeling quantifies aircraft Carrier life cycle cost and readiness , 1999 .

[2]  V. Jayabalan,et al.  Optimal maintenance and replacement policy for a deteriorating system with increased mean downtime , 1992 .

[3]  Richard Curran,et al.  An integrated systems engineering approach to aircraft design , 2006 .

[4]  Emmanuel Benard,et al.  Modelling of aircraft manufacturing cost at the concept stage , 2006 .

[5]  Amik Garg,et al.  Maintenance management: literature review and directions , 2006 .

[6]  Terje Aven,et al.  A framework for reliability and risk centered maintenance , 2011, Reliab. Eng. Syst. Saf..

[7]  Laxman Yadu Waghmode,et al.  Reliability analysis and life cycle cost optimization: a case study from Indian industry , 2016 .

[8]  I. M. Chewning,et al.  Advances in Aircraft Carrier Life Cycle Cost Analysis for Acquisition and Ownership Decision‐Making , 2000 .

[9]  John Crocker,et al.  Maintenance free operating period – an alternative measure to MTBF and failure rate for specifying reliability? , 1999 .

[10]  Balbir S. Dhillon,et al.  Reliability, Quality, and Safety for Engineers , 2004 .

[11]  Marcus Johansson,et al.  Maintenance and reliability with focus on aircraft maintenance and spares provisioning , 2006 .

[12]  Milind Dawande,et al.  Optimal Reliability Allocation with Discrete Cost-Reliability Data for Components , 1999, Oper. Res..

[13]  Joseph Butterfield,et al.  Aircraft cost modelling using the genetic causal technique within a systems engineering approach , 2007, The Aeronautical Journal (1968).

[14]  Yongsheng Ma,et al.  Product lifecycle management in aviation maintenance, repair and overhaul , 2008, Comput. Ind..

[15]  Mazhar Ali Khan Malik,et al.  Reliable Preventive Maintenance Scheduling , 1979 .

[16]  Claudia Paciarotti,et al.  Integration between RCM and RAM: a case study , 2016 .

[17]  Gao Jun,et al.  Direct maintenance cost prediction of civil aircraft , 2014 .

[18]  Roger Dixon,et al.  Optimization of reliability and maintenance of liquefaction system on FLNG terminals using Markov modelling , 2014 .

[19]  Emmanuel Benard,et al.  A generic tool for cost estimating in aircraft design , 2004 .

[20]  D. N. Prabhakar Murthy,et al.  Warranty Cost Analysis , 2019 .

[21]  Claus Meisl The future of design integrated cost modeling , 1992 .

[22]  Mahmood Shafiee,et al.  A parametric whole life cost model for offshore wind farms , 2016, The International Journal of Life Cycle Assessment.

[23]  Adamantios Mettas,et al.  Reliability allocation and optimization for complex systems , 2000, Annual Reliability and Maintainability Symposium. 2000 Proceedings. International Symposium on Product Quality and Integrity (Cat. No.00CH37055).

[24]  Sandip Roy,et al.  Maintenance optimization using probabilistic cost-benefit analysis , 2009 .

[25]  Dong Ho Park,et al.  Cost minimization for periodic maintenance policy of a system subject to slow degradation , 2000, Reliab. Eng. Syst. Saf..

[26]  H. E. Boren,et al.  Cost-Estimating Relationships for Aircraft Airframes , 1972 .

[27]  Lesley Walls,et al.  Improving design for reliability with in-service data analysis , 2002, Annual Reliability and Maintainability Symposium. 2002 Proceedings (Cat. No.02CH37318).

[28]  Per Hokstad,et al.  An overall model for maintenance optimization , 1996 .

[29]  B. Blanchard,et al.  Life-cycle cost and economic analysis , 1991 .