Proactive Productivity Management at Job Sites: Understanding Characteristics of Assumptions Made for Construction Processes during Planning Based on Case Studies and Interviews

AbstractDuring planning and execution of construction projects, project planners and managers make various assumptions with respect to execution of construction activities, availability of resources, suitability of construction methods, and status of preceding activities. However, not all of these assumptions are explicitly documented and verified before the construction activities start. Decisions made based on invalid assumptions can negatively impact the outcomes of construction projects, such as rework, activity delays, and extra material cost. To address the problems caused by invalid assumptions, this paper proposed to develop a formal approach to capture and represent assumptions and proactively verify assumptions to reduce the uncertainties associated with construction projects. To develop such a formal approach, an initial step is to identify characteristics of assumptions. The research team conducted two detailed case studies (i.e., a bridge rehabilitation project and a research lab renovation p...

[1]  Gregory A. Howell,et al.  Uncertainty and project objectives , 1993 .

[2]  Jamal F. Al‐Bahar,et al.  Systematic Risk Management Approach for Construction Projects , 1990 .

[3]  J. Rowley Using case studies in research , 2002 .

[4]  Glenn Ballard Improving Work Flow Reliability , 1999 .

[5]  Michel Wermelinger,et al.  Managing assumptions during agile development , 2009, 2009 ICSE Workshop on Sharing and Reusing Architectural Knowledge.

[6]  Andriy V. Miranskyy,et al.  Modelling assumptions and requirements in the context of project risk , 2005, 13th IEEE International Conference on Requirements Engineering (RE'05).

[7]  Gregory A. Howell,et al.  An Update on Last Planner , 2003 .

[8]  Chris Chapman,et al.  Transforming project risk management into project uncertainty management , 2003 .

[9]  Hee-Sung Park Conceptual framework of construction productivity estimation , 2006 .

[10]  J. Dewar Assumption-Based Planning: The essence of Assumption-Based Planning , 2002 .

[11]  Liang Y. Liu,et al.  Contemporaneous Time Series and Forecasting Methodologies for Predicting Short-Term Productivity , 2010 .

[12]  J. U. M. Smith,et al.  Project Risk Management: Processes, Techniques and Insights , 1998, J. Oper. Res. Soc..

[13]  Winston M. Tellis,et al.  APPLICATION OF A CASE STUDY METHODOLOGY , 1997 .

[14]  Sven Bertelsen,et al.  Lean Construction: Where Are We and How To Proceed? , 2004, Lean Construction Journal.

[15]  Chris Hendrickson,et al.  Project Management for Construction: Fundamental Concepts for Owners, Engineers, Architects, and Builders , 1989 .

[16]  Christina J. Hopfe,et al.  Uncertainty and sensitivity analysis in building performance simulation for decision support and design optimization , 2009 .

[17]  Tarek Hegazy,et al.  Project performance control in reconstruction projects , 2000 .

[18]  Gregory A. Howell,et al.  SHIELDING PRODUCTION: ESSENTIAL STEP IN PRODUCTION CONTROL , 1998 .

[19]  P. Lago,et al.  Explicit assumptions enrich architectural models , 2005, Proceedings. 27th International Conference on Software Engineering, 2005. ICSE 2005..

[20]  A. Akintoye,et al.  Risk analysis and management in construction , 1997 .

[21]  Paul M. Goodrum,et al.  Partial Factor Productivity and Equipment Technology Change at Activity Level in U.S. Construction Industry , 2002 .

[22]  Iris D. Tommelein,et al.  Improving Labor Flow Reliability for Better Productivity as Lean Construction Principle , 2003 .

[23]  Herman Glenn Ballard,et al.  THE LAST PLANNER SYSTEM OF PRODUCTION CONTROL , 2000 .

[24]  Rafael Sacks,et al.  Assessing research issues in Automated Project Performance Control (APPC) , 2007 .

[25]  Paul M. Goodrum,et al.  U.S. construction labor productivity trends, 1970-1998 , 2000 .

[26]  Grace A. Lewis,et al.  Assumptions Management in Software Development , 2004 .

[27]  Glenn Ballard,et al.  Management Thinking in the Earned Value Method System and the Last Planner System , 2010 .

[28]  Donald D. Tippett,et al.  Project Risk Management Using the Project Risk FMEA , 2004 .

[29]  Raymond E. Levitt,et al.  OARPLAN: Generating project plans by reasoning about objects, actions and resources , 1988, Artificial Intelligence for Engineering Design, Analysis and Manufacturing.

[30]  Lui Sha,et al.  An Assumptions Management Framework for Systems Software , 2006 .

[31]  Ossama Salem,et al.  Lean Construction: From Theory to Implementation , 2006 .

[32]  R. Yin Case Study Research: Design and Methods , 1984 .

[33]  C. Meyer,et al.  A Case in Case Study Methodology , 2001 .

[34]  D. Campbell,et al.  Convergent and discriminant validation by the multitrait-multimethod matrix. , 1959, Psychological bulletin.