Factors affecting software testing time schedule

The objective of this study was to identify and model constructs associated with over-runs in software testing time schedules. 40 industry experts from 30 organizational units were interviewed and conclusions were made using regression analysis. The analysis revealed that increased communication and interaction in the design phase between development and testing are associated with time schedule over-runs. This unexpected result may be either a consequence of more comprehensive testing with increased communication and interaction, leading to time schedule over-runs, or the testing time schedule is adjusted under project pressure because of underestimated testing resource needs. Lack of testing know-how was also associated with testing time schedule over-runs. The results of this study can be utilized in planning software testing time schedules.

[1]  Paul Strooper Proceedings of the 2005 Australian Software Engineering Conference , 2004 .

[2]  L. Cronbach Coefficient alpha and the internal structure of tests , 1951 .

[3]  Juha Itkonen,et al.  Increasing understanding of the modern testing perspective in software development projects , 2003, 36th Annual Hawaii International Conference on System Sciences, 2003. Proceedings of the.

[4]  Juhani Iivari,et al.  Why are CASE tools not used? , 1996, CACM.

[5]  Khaled El Emam,et al.  Spice: The Theory and Practice of Software Process Improvement and Capability Determination , 1997 .

[6]  Khaled El Emam,et al.  Validating the ISO/IEC 15504 Measure of Software Requirements Analysis Process Capability , 2000, IEEE Trans. Software Eng..

[7]  Yehuda Baruch,et al.  Response Rate in Academic Studies — A Comparative Analysis , 1999 .

[8]  Kalle Lyytinen,et al.  A framework for identifying software project risks , 1998, CACM.

[9]  Balaji Rajagopalan,et al.  Information flow parameters for managing organizational processes , 2003, CACM.

[10]  Khaled El Emam,et al.  Validating the ISO/IEC 15504 measures of software development process capability , 2000, J. Syst. Softw..

[11]  Tsong Yueh Chen,et al.  A preliminary survey on software testing practices in Australia , 2004, 2004 Australian Software Engineering Conference. Proceedings..

[12]  Ossi Taipale,et al.  Finding and Ranking Research Directions for Software Testing , 2005, EuroSPI.

[13]  Yoke San Wong,et al.  Analyzing quality information flows in cross-company distributed product development processes , 2004, 2004 IEEE International Engineering Management Conference (IEEE Cat. No.04CH37574).

[14]  Tore Dybå,et al.  An Instrument for Measuring the Key Factors of Success in Software Process Improvement , 2000, Empirical Software Engineering.

[15]  Shari Lawrence Pfleeger,et al.  Preliminary Guidelines for Empirical Research in Software Engineering , 2002, IEEE Trans. Software Eng..

[16]  C. J. Harwood Test Process Improvement: A Practical Step‐by‐Step Guide to Structured Testing , 2000 .

[17]  J. Olsen,et al.  The European Commission , 2020, The European Union.

[18]  Jan Pries-Heje,et al.  How Internet software companies negotiate quality , 2001, Computer.