A FPTAS for a two-stage hybrid flow shop problem and optimal algorithms for identical jobs
暂无分享,去创建一个
[1] Qi Wei. An Optimal Algorithm for a Special Flow Shop Problem with Infinite Buffer Capacity , 2011 .
[2] S. M. Johnson,et al. Optimal two- and three-stage production schedules with setup times included , 1954 .
[3] Chelliah Sriskandarajah,et al. A Survey of Machine Scheduling Problems with Blocking and No-Wait in Process , 1996, Oper. Res..
[4] Ronald G. Askin,et al. Dynamic task assignment for throughput maximization with worksharing , 2006, Eur. J. Oper. Res..
[5] Eugeniusz Nowicki,et al. The permutation flow shop with buffers: A tabu search approach , 1999, Eur. J. Oper. Res..
[6] Qi Wei,et al. Approximation Algorithms for a Two-Stage Hybrid Flow Shop: Approximation Algorithms for a Two-Stage Hybrid Flow Shop , 2012 .
[7] George L. Vairaktarakis,et al. Flowshops with processing flexibility across production stages , 1998 .
[8] Donald D. Eisenstein,et al. A Production Line that Balances Itself , 1996, Oper. Res..
[9] L. Tang,et al. Lagrangian relaxation algorithms for real-time hybrid flowshop scheduling with finite intermediate buffers , 2006, J. Oper. Res. Soc..
[10] Tadeusz Sawik,et al. A scheduling algorithm for flexible flow lines with limited intermediate buffers , 1993 .
[11] Yossi Bukchin,et al. Design and operation of dynamic assembly lines using work-sharing , 2006 .
[12] George L. Vairaktarakis,et al. Analysis of algorithms for two‐stage flowshops with multi‐processor task flexibility , 2004 .
[13] H. Yong,et al. A two-stage semi-hybrid flowshop problem in graphics processing , 2005 .