Reliability-based maintenance and job scheduling for identical parallel machines

Quality has an important role in manufacturing, and on the other hand, machine condition has a significant effect on quality. Based on this fact, all manufacturers integrate the production scheduling with maintenance activities to keep the machines in perfect conditions. In this paper, we propose a mixed integer nonlinear model to optimise the quality cost, maintenance cost, earliness–tardiness cost and interruption cost simultaneously. We assume that if machines work in undesirable conditions, their quality is reduced, resulting in quality cost. On the other hand, if the machines are repaired to decrease the quality cost, maintenance cost and other cost such as earliness–tardiness cost and interruption cost are imposed to the manufacturer. Several numerical instances are implemented by the proposed model to show the model effectiveness to obtain the best maintenance and production scheduling with minimum quality cost.

[1]  Günter Schmidt,et al.  Scheduling with limited machine availability , 2000, Eur. J. Oper. Res..

[2]  Marc E. Posner,et al.  Generating Experimental Data for Computational Testing with Machine Scheduling Applications , 2001, Oper. Res..

[3]  Chung Yee Lee,et al.  Scheduling maintenance and semiresumable jobs on a single machine , 1999 .

[4]  Charles O. Smith,et al.  Introduction to reliability in design , 1976 .

[5]  Srinivas Kumar Pinjala,et al.  An empirical investigation on the relationship between business and maintenance strategies , 2006 .

[6]  I. Alsyouf Maintenance practices in Swedish industries: Survey results , 2009 .

[7]  Gur Mosheiov,et al.  New Results On Sequencing With Rate Modification , 2003 .

[8]  Tarek Y. ElMekkawy,et al.  Robust and stable flexible job shop scheduling with random machine breakdowns using a hybrid genetic algorithm , 2011 .

[9]  I. Alsyouf The role of maintenance in improving companies' productivity and profitability , 2002 .

[10]  Shad Dowlatshahi The role of industrial maintenance in the maquiladora industry: An empirical analysis , 2008 .

[11]  El Houssaine Aghezzaf,et al.  An integrated production and preventive maintenance planning model , 2007, Eur. J. Oper. Res..

[12]  C.-Y. Lee,et al.  Machine scheduling with a rate-modifying activity , 2001, Eur. J. Oper. Res..

[13]  Noureddine ZERHOUNI,et al.  Genetic Algorithm for scheduling production and maintenance in a Flow Shop , 2015 .

[14]  Rubén Ruiz,et al.  Considering scheduling and preventive maintenance in the flowshop sequencing problem , 2007, Comput. Oper. Res..

[15]  Sofia Panagiotidou,et al.  Optimal preventive maintenance for equipment with two quality states and general failure time distributions , 2007, Eur. J. Oper. Res..

[16]  Xiangtong Qi,et al.  Scheduling the maintenance on a single machine , 1999, J. Oper. Res. Soc..

[17]  Maher Rebai,et al.  Scheduling jobs and maintenance activities on parallel machines , 2013, Oper. Res..

[18]  Lionel Amodeo,et al.  Bi-objective optimization algorithms for joint production and maintenance scheduling: application to the parallel machine problem , 2009, J. Intell. Manuf..

[19]  Kevin W. Linderman,et al.  An integrated systems approach to process control and maintenance , 2005, Eur. J. Oper. Res..

[20]  Divya Pandey,et al.  A methodology for joint optimization for maintenance planning, process quality and production scheduling , 2011, Comput. Ind. Eng..