A New Technique for Simulating the Operation of Multiple Assigned-Energy Generating Units Suitable for Use in Generation System Expansion Planning Models

A new technique is presented for probabilistically simulating the operation of power systems which include multiple assigned-energy units (e. g., conventional hydroelectric plants or groups of plants, and, under certain circumstances, nuclear units, conventional thermal units operating under " take-or-pay" fuel supply contracts, and cogeneration units). Within the context of the probabilistic simulation, the new technique is completely rigorous. Statistical cumulants are used to represent equivalent load. The new technique has been successfully applied in an advanced technology evaluation and expansion model--the TVA TARANTULA model. This application has been accomplished without sacrificing other simulation capabilities such as random partial outages, maintenance scheduling based on LOLP and short-term load forecast uncertainty, and the ability to aggregate (without loss of rigor) groups of many small units for purposes of computational expediency. A description is provided of tests performed to evaluate the new technique.

[1]  R. R. Booth,et al.  Power System Simulation Model Based on Probability Analysis , 1972 .

[2]  N.S. Rau,et al.  Expected Energy Production Costs by the Method of Moments , 1980, IEEE Transactions on Power Apparatus and Systems.

[3]  J. Stremel,et al.  Production Costing Using the Cumulant Method of Representing the Equivalent Load Curve , 1980, IEEE Transactions on Power Apparatus and Systems.

[4]  Roy Billinton,et al.  Reliability Evaluation in Energy Limited Generating Capacity Studies , 1978, IEEE Transactions on Power Apparatus and Systems.

[5]  Zia Yamayee,et al.  Analytical Treatment of Hydro Units with Random Energy in Stochastic Production Simulation , 1982, IEEE Transactions on Power Apparatus and Systems.