Discussion of “Application of the Water Cycle Algorithm to the Optimal Operation of Reservoir Systems” by Omid Bozorg Haddad, Mojtaba Moravej, and Hugo A. Loáiciga

[1]  Omid Bozorg Haddad,et al.  Application of the Water Cycle Algorithm to the Optimal Operation of Reservoir Systems , 2015 .

[2]  Elahe Fallah-Mehdipour,et al.  Developing reservoir operational decision rule by genetic programming , 2013 .

[3]  M. Mariño,et al.  Estimation of Muskingum parameter by meta-heuristic algorithms , 2013 .

[4]  Omid Bozorg Haddad,et al.  Optimal design of stepped spillways using the HBMO algorithm , 2010 .

[5]  O. Bozorg Haddad,et al.  Real-Time Operation of Reservoir System by Genetic Programming , 2012, Water Resources Management.

[6]  Elahe Fallah-Mehdipour,et al.  Extraction of Multicrop Planning Rules in a Reservoir System: Application of Evolutionary Algorithms , 2013 .

[7]  Omid Bozorg Haddad,et al.  Design–operation optimisation of run-of-river power plants , 2011 .

[8]  Miguel A. Mariño,et al.  Optimal cultivation rules in multi‐crop irrigation areas , 2009 .

[9]  M. A. Mariño,et al.  Effects of Pipe Roughness Uncertainty on Water Distribution Network Performance During its Operational Period , 2013, Water Resources Management.

[10]  Omid Bozorg Haddad,et al.  Algorithm for Increasing the Speed of Evolutionary Optimization and its Accuracy in Multi-objective Problems , 2013, Water Resources Management.

[11]  O. Bozorg Haddad,et al.  MOPSO algorithm and its application in multipurpose multireservoir operations E. Fallah-Mehdipour, O. Bozorg Haddad and M. A. Marino , 2011 .

[12]  Omid Bozorg Haddad,et al.  Site selection of raingauges using entropy methodologies , 2011 .

[13]  Omid Bozorg Haddad,et al.  Optimum operation of wells in coastal aquifers , 2011 .

[14]  Omid Bozorg Haddad,et al.  Finding the shortest path with honey-bee mating optimization algorithm in project management problems with constrained/unconstrained resources , 2010, Comput. Optim. Appl..

[15]  Omid Bozorg Haddad,et al.  Extraction of decision alternatives in construction management projects: Application and adaptation of NSGA-II and MOPSO , 2012, Expert Syst. Appl..

[16]  M. Mariño,et al.  Long-term efficiency of water networks with demand uncertainty , 2011 .