ANTIPROTON DECELERATOR STATUS REPORT
暂无分享,去创建一个
The Antiproton Decelerator (AD) has been delivering 5.3 MeV antiprotons to the experiments for 10 years now. Beam cooling is essential for the AD operation. We review the AD machine and in particular the cooling performance. We give an overview of the present and future experiments and also the possible further deceleration of the beam from 5.3 MeV to 100 keV kinetic energy.
[1] L. Soby,et al. ELENA, a preliminary cost and feasibility study , 2007 .
[2] Y. Bylinsky,et al. First operating experience with the CERN decelerating RFQ for antiprotons , 2001, PACS2001. Proceedings of the 2001 Particle Accelerator Conference (Cat. No.01CH37268).
[3] L. Soby,et al. Commissioning and first operation of the Antiproton Decelerator (AD) , 2001, PACS2001. Proceedings of the 2001 Particle Accelerator Conference (Cat. No.01CH37268).