Soil improvement works for Changi East Reclamation Project
暂无分享,去创建一个
Reclamation in Changi East, Singapore involved the formation of 2000 ha of land. The use of prefabricated vertical drains, combined with surcharge, was required to accelerate the consolidation sett...
[1] V. Choa,et al. One-dimension compression of slurry with radial drainage , 1999 .
[2] Asuri Sridharan,et al. RECTANGULAR HYPERBOLA FITTING METHOD FOR ONE DIMENSIONAL CONSOLIDATION , 1981 .