Impact of Selected Project Characteristics on Construction Claims in Niger State, Nigeria

Over the last three decades, the construction industry in the developing countries has experienced continuous increase in claims, liability exposures and disputes, along with increasing difficulty in reaching reasonable dispute settlements. The research aimed to investigate the impact of project characteristics on construction claims in Niger State. It was hypothesized that there is no statistically significant difference between size of a project or the project duration and claim amount in building projects in Niger State. The review of literature revealed five main causes of claims. The study used both quantitative and qualitative methods through administration of questionnaires and the analysis of secondary data such as the estimated project duration, and actual completion dates of 196 projects using descriptive and inferential statistics. The research revealed that unrealistic time targets, and poor communication, are two of the five major causes of claims. The study revealed that duration of project is the characteristic with the most influence in Niger State, and that both size and duration of a project have the tendency of increasing or decreasing simultaneously. It was recommended among others, that key players in construction projects should ensure that sufficient float is built into the schedule so that when delays do occur, they are absorbed into the contract and are less likely to become critical to the overall construction schedule.

[1]  Lynn Crawford,et al.  Causes of delay and cost overruns in construction of groundwater projects in a developing countries; Ghana as a case study , 2003 .

[2]  Florence Yean Yng Ling Key determinants of performance of design-bid-build projects in Singapore , 2004 .

[3]  James P. Holland,et al.  Professional Liability of the Architect and Engineer , 1985 .

[4]  Anil Sawhney,et al.  Analysing factors affecting delays in Indian construction projects , 2012 .

[5]  Fetene Nega CAUSES AND EFFECTS OF COST OVERRUN ON PUBLIC BUILDING CONSTRUCTION PROJECTS IN ETHIOPIA , 2008 .

[6]  Walter O. Rom,et al.  Analysis of the characteristics of projects in diverse industries , 1998 .

[7]  G. O. Jagboro,et al.  The effects of construction delays on project delivery in Nigerian construction industry , 2002 .

[8]  Francis T. Hartman,et al.  Construction Claims and Disputes: Causes and Cost/Time Overruns , 1994 .

[9]  David Baccarini,et al.  The concept of project complexity—a review , 1996 .

[10]  Shamil Naoum An investigation into the performance of management contracts and the traditional methods of building procurement , 1989 .

[11]  Paul Levin Construction Contract Claims, Changes & Dispute Resolution , 1998 .

[12]  Frank C. Harris,et al.  Identification and evaluation of factors influencing variations on building projects , 1997 .

[13]  G. Ojo Project characteristics influence on risk associated with construction clients’ cash flow prediction , 2012 .

[14]  Marcel Abendroth Construction Contracting A Practical Guide To Company Management , 2016 .

[15]  Fazil T. Najafi,et al.  Cost and time overruns in highway construction , 2002 .

[16]  James E. Diekmann,et al.  Construction Claims: Frequency and Severity , 1985 .

[17]  Liang Y Liu,et al.  ANALYTICAL MODEL FOR ANALYZING CONSTRUCTION CLAIMS AND OPPORTUNISTIC BIDDING , 2004 .

[18]  Nie-Jia Yau,et al.  Factors Causing Design Schedule Delays in Turnkey Projects in Taiwan: An Empirical Study of Power Distribution Substation Projects , 2012 .

[19]  Amiruddin Ismail,et al.  Significant factors causing and effects of delay in Iranian construction projects , 2011 .

[20]  D W Morgan,et al.  DETERMINING SAMPLE SIZE FOR ACTIVITIES , 1970 .

[21]  Mohan M. Kumaraswamy,et al.  Comparing contributors to time and cost performance in building projects , 1998 .

[22]  C. William Ibbs Product Specification Practices and Problems , 1985 .