Impact of Selected Project Characteristics on Construction Claims in Niger State, Nigeria
暂无分享,去创建一个
[1] Lynn Crawford,et al. Causes of delay and cost overruns in construction of groundwater projects in a developing countries; Ghana as a case study , 2003 .
[2] Florence Yean Yng Ling. Key determinants of performance of design-bid-build projects in Singapore , 2004 .
[3] James P. Holland,et al. Professional Liability of the Architect and Engineer , 1985 .
[4] Anil Sawhney,et al. Analysing factors affecting delays in Indian construction projects , 2012 .
[5] Fetene Nega. CAUSES AND EFFECTS OF COST OVERRUN ON PUBLIC BUILDING CONSTRUCTION PROJECTS IN ETHIOPIA , 2008 .
[6] Walter O. Rom,et al. Analysis of the characteristics of projects in diverse industries , 1998 .
[7] G. O. Jagboro,et al. The effects of construction delays on project delivery in Nigerian construction industry , 2002 .
[8] Francis T. Hartman,et al. Construction Claims and Disputes: Causes and Cost/Time Overruns , 1994 .
[9] David Baccarini,et al. The concept of project complexity—a review , 1996 .
[10] Shamil Naoum. An investigation into the performance of management contracts and the traditional methods of building procurement , 1989 .
[11] Paul Levin. Construction Contract Claims, Changes & Dispute Resolution , 1998 .
[12] Frank C. Harris,et al. Identification and evaluation of factors influencing variations on building projects , 1997 .
[13] G. Ojo. Project characteristics influence on risk associated with construction clients’ cash flow prediction , 2012 .
[14] Marcel Abendroth. Construction Contracting A Practical Guide To Company Management , 2016 .
[15] Fazil T. Najafi,et al. Cost and time overruns in highway construction , 2002 .
[16] James E. Diekmann,et al. Construction Claims: Frequency and Severity , 1985 .
[17] Liang Y Liu,et al. ANALYTICAL MODEL FOR ANALYZING CONSTRUCTION CLAIMS AND OPPORTUNISTIC BIDDING , 2004 .
[18] Nie-Jia Yau,et al. Factors Causing Design Schedule Delays in Turnkey Projects in Taiwan: An Empirical Study of Power Distribution Substation Projects , 2012 .
[19] Amiruddin Ismail,et al. Significant factors causing and effects of delay in Iranian construction projects , 2011 .
[20] D W Morgan,et al. DETERMINING SAMPLE SIZE FOR ACTIVITIES , 1970 .
[21] Mohan M. Kumaraswamy,et al. Comparing contributors to time and cost performance in building projects , 1998 .
[22] C. William Ibbs. Product Specification Practices and Problems , 1985 .