Efficient Approach to Failure Response of Process Module in Dual-Arm Cluster Tools With Wafer Residency Time Constraints
暂无分享,去创建一个
Zhiwu Li | Ting Qu | NaiQi Wu | Yan Qiao | MengChu Zhou | SiWei Zhang | Mengchu Zhou | N. Wu | Zhiwu Li | T. Qu | Yan Qiao | SiWei Zhang
[1] MengChu Zhou,et al. Petri Net Modeling and Cycle-Time Analysis of Dual-Arm Cluster Tools With Wafer Revisiting , 2013, IEEE Transactions on Systems, Man, and Cybernetics: Systems.
[2] H. Toba. Segment-based approach for real-time reactive rescheduling for automatic manufacturing control , 1999, 1999 IEEE International Symposium on Semiconductor Manufacturing Conference Proceedings (Cat No.99CH36314).
[3] MengChu Zhou,et al. Robust Scheduling of Time-Constrained Dual-Arm Cluster Tools With Wafer Revisiting and Activity Time Disturbance , 2019, IEEE Transactions on Systems, Man, and Cybernetics: Systems.
[4] Tae-Eog Lee,et al. Modeling and implementing a real-time scheduler for dual-armed cluster tools , 2001, Comput. Ind..
[5] MengChu Zhou,et al. Pareto-Optimization for Scheduling of Crude Oil Operations in Refinery via Genetic Algorithm , 2017, IEEE Transactions on Systems, Man, and Cybernetics: Systems.
[6] S. C. Wood,et al. Systems of multiple cluster tools: configuration, reliability, and performance , 2003 .
[7] Tae-Eog Lee,et al. Noncyclic Scheduling for Timed Discrete-Event Systems With Application to Single-Armed Cluster Tools Using Pareto-Optimal Optimization , 2013, IEEE Transactions on Automation Science and Engineering.
[8] Wai Kin Chan,et al. Optimal Scheduling of Multicluster Tools With Constant Robot Moving Times, Part I: Two-Cluster Analysis , 2011, IEEE Transactions on Automation Science and Engineering.
[9] Hyun-Jung Kim,et al. Optimal scheduling of transient cycles for single-armed cluster tools , 2016, 2013 IEEE International Conference on Automation Science and Engineering (CASE).
[10] Ting Qu,et al. On a maximally permissive deadlock prevention policy for automated manufacturing systems by using resource-oriented Petri nets. , 2019, ISA transactions.
[11] MengChu Zhou,et al. Disassembly Sequence Planning Considering Fuzzy Component Quality and Varying Operational Cost , 2018, IEEE Transactions on Automation Science and Engineering.
[12] MengChu Zhou,et al. Modeling, Analysis and Control of Dual-Arm Cluster Tools With Residency Time Constraint and Activity Time Variation Based on Petri Nets , 2012, IEEE Transactions on Automation Science and Engineering.
[13] Zhiwu Li,et al. Fault Identification of Discrete Event Systems Modeled by Petri Nets With Unobservable Transitions , 2019, IEEE Transactions on Systems, Man, and Cybernetics: Systems.
[14] MengChu Zhou,et al. How to Respond to Process Module Failure in Residency Time-Constrained Single-Arm Cluster Tools , 2014, IEEE Transactions on Semiconductor Manufacturing.
[15] S. Venkatesh,et al. A steady-state throughput analysis of cluster tools: dual-blade versus single-blade robots , 1997 .
[16] Wlodzimierz M. Zuberek,et al. Timed Petri nets in modeling and analysis of cluster tools , 2001, IEEE Trans. Robotics Autom..
[17] Jun-Ho Lee,et al. Scheduling transient periods of dual-armed cluster tools , 2012, 2012 IEEE International Conference on Mechatronics and Automation.
[18] Tae-Eog Lee,et al. Scheduling analysis of time-constrained dual-armed cluster tools , 2003 .
[19] Xi Lifeng,et al. Filtered-beam-search-based algorithm for dynamic rescheduling in FMS , 2007 .
[20] Yang Liu,et al. Multiagent and Bargaining-Game-Based Real-Time Scheduling for Internet of Things-Enabled Flexible Job Shop , 2019, IEEE Internet of Things Journal.
[21] Jun-Ho Lee,et al. Scheduling Lot Switching Operations for Cluster Tools , 2013, IEEE Transactions on Semiconductor Manufacturing.
[22] MengChu Zhou,et al. Scheduling Cluster Tools in Semiconductor Manufacturing: Recent Advances and Challenges , 2018, IEEE Transactions on Automation Science and Engineering.
[23] MengChu Zhou,et al. Schedulability Analysis and Optimal Scheduling of Dual-Arm Cluster Tools With Residency Time Constraint and Activity Time Variation , 2012, IEEE Transactions on Automation Science and Engineering.
[24] Naiqi Wu,et al. Model-based fault identification of discrete event systems using partially observed Petri nets , 2018, Autom..
[25] Hyun Joong Yoon,et al. Online scheduling of integrated single-wafer processing tools with temporal constraints , 2005, IEEE Transactions on Semiconductor Manufacturing.
[26] Han-Pang Huang,et al. A New Approach to On-Line Rescheduling for a Semiconductor Foundry Fab , 2006, 2006 IEEE International Conference on Systems, Man and Cybernetics.
[27] Pei Li,et al. Robust Deadlock Control for Automated Manufacturing Systems With Unreliable Resources Based on Petri Net Reachability Graphs , 2019, IEEE Transactions on Systems, Man, and Cybernetics: Systems.
[28] MengChu Zhou,et al. Wafer Sojourn Time Fluctuation Analysis of Time-Constrained Dual-Arm Cluster Tools With Wafer Revisiting and Activity Time Variation , 2018, IEEE Transactions on Systems, Man, and Cybernetics: Systems.
[29] Babak Hamidzadeh,et al. An optimal periodic scheduler for dual-arm robots in cluster tools with residency constraints , 2001, IEEE Trans. Robotics Autom..
[30] Shengwei Ding,et al. Steady-State Throughput and Scheduling Analysis of Multicluster Tools: A Decomposition Approach , 2008, IEEE Transactions on Automation Science and Engineering.
[31] MengChu Zhou,et al. Scheduling of Dual-Arm Cluster Tools With Wafer Revisiting and Residency Time Constraints , 2014, IEEE Transactions on Industrial Informatics.
[32] Feng Chu,et al. A Petri Net Method for Schedulability and Scheduling Problems in Single-Arm Cluster Tools With Wafer Residency Time Constraints , 2008, IEEE Transactions on Semiconductor Manufacturing.
[33] R. S. Gyurcsik,et al. Single-wafer cluster tool performance: an analysis of throughput , 1994 .
[34] MengChu Zhou,et al. Petri Net Modeling and Scheduling of a Close-Down Process for Time-Constrained Single-Arm Cluster Tools , 2018, IEEE Transactions on Systems, Man, and Cybernetics: Systems.
[35] Jun-Ho Lee,et al. Makespan Analysis of Lot Switching Period in Cluster Tools , 2016, IEEE Transactions on Semiconductor Manufacturing.
[36] Bo Guo,et al. Rescheduling and optimization of schedules considering machine failures , 1999 .
[37] Jun-Ho Lee,et al. Scheduling Cluster Tools With Ready Time Constraints for Consecutive Small Lots , 2013, IEEE Transactions on Automation Science and Engineering.
[38] MengChu Zhou,et al. Scheduling of Single-Arm Cluster Tools for an Atomic Layer Deposition Process With Residency Time Constraints , 2017, IEEE Transactions on Systems, Man, and Cybernetics: Systems.
[39] Zhiwu Li,et al. Energy efficiency optimization in scheduling crude oil operations of refinery based on linear programming , 2017 .
[40] Tae-Eog Lee,et al. Scheduling start-up and close-down periods of dual-armed cluster tools with wafer delay regulation , 2012 .
[41] MengChu Zhou,et al. Scheduling and Control of Startup Process for Single-Arm Cluster Tools With Residency Time Constraints , 2017, IEEE Transactions on Control Systems Technology.
[42] M.C. Fu,et al. Optimal preventive maintenance scheduling in semiconductor manufacturing , 2004, IEEE Transactions on Semiconductor Manufacturing.
[43] Gerhard Friedrich,et al. Applying Local Rescheduling in response to schedule disruptions , 2008, Ann. Oper. Res..
[44] MengChu Zhou,et al. Schedulability and Scheduling Analysis of Dual-Arm Cluster Tools with Wafer Revisiting and Residency Time Constraints Based on a Novel Schedule , 2015, IEEE Transactions on Systems, Man, and Cybernetics: Systems.
[45] Jun-Ho Lee,et al. Completion Time Analysis of Wafer Lots in Single-Armed Cluster Tools With Parallel Processing Modules , 2017, IEEE Transactions on Automation Science and Engineering.
[46] Tae-Eog Lee,et al. An extended event graph with negative places and tokens for time window constraints , 2005, IEEE Transactions on Automation Science and Engineering.
[47] Jun-Ho Lee,et al. Noncyclic Scheduling of Cluster Tools With a Branch and Bound Algorithm , 2015, IEEE Transactions on Automation Science and Engineering.
[48] MengChu Zhou,et al. Optimal One-Wafer Cyclic Scheduling and Buffer Space Configuration for Single-Arm Multicluster Tools With Linear Topology , 2016, IEEE Transactions on Systems, Man, and Cybernetics: Systems.
[49] MengChu Zhou,et al. A Closed-Form Solution for Schedulability and Optimal Scheduling of Dual-Arm Cluster Tools With Wafer Residency Time Constraint Based on Steady Schedule Analysis , 2010, IEEE Transactions on Automation Science and Engineering.
[50] Naiqi Wu,et al. Petri net-based approach to short-term scheduling of crude oil operations with less tank requirement , 2017, Inf. Sci..
[51] MengChu Zhou,et al. Response Policies to Process Module Failure in Single-Arm Cluster Tools Subject to Wafer Residency Time Constraints , 2015, IEEE Transactions on Automation Science and Engineering.
[52] Hyun-Jung Kim,et al. Closed-Form Expressions on Lot Completion Time for Dual-Armed Cluster Tools With Parallel Processing Modules , 2019, IEEE Transactions on Automation Science and Engineering.
[53] R. S. Gyurcsik,et al. Single-wafer cluster tool performance: an analysis of the effects of redundant chambers and revisitation sequences on throughput , 1996 .
[54] MengChu Zhou,et al. Short-term scheduling of crude oil operations in refinery with high-fusion-point oil and two transportation pipelines , 2016, Enterp. Inf. Syst..