Safety risk identification and prioritize of forest logging activities using analytic hierarchy process (AHP)

Abstract In the safety risk assessment, since the determination of risk criteria depending on individuals constitutes subjectivity, it raises some doubts about the reliability of the risk assessment results. Determining the consistency of risk criteria will enable more reliable results in risk assessment. In this study, it is aimed for defining the main and sub-risks to which chainsaw operators working in forest logging are exposed, calculating weight levels using and to develop a framework for precaution plans. The risks were identified by six experts by brainstorming using the information obtained as a result of literature review, workplace observations and work evaluations. As a result of the brainstorming, it has been determined six main risk criteria and twenty-nine sub-risk criteria for chainsaw operators. The weights and ranks of the main and sub-risk criteria were determined by the Analytical Hierarchy Process (AHP) method, using the results of the surveys applied to expert team of thirty-four people. As a result of AHP application, the consistency values (CR) of all risk criteria was determined less than 0.1, and this showed that the decisions made by the experts were consistent. The main risk criteria according to their priorities were determined as psychological (0.208), physical (0.200), technical (0.198), organizational (0.157), biological (0.130) and chemical (0.108) risks. The most priority sub-risk criteria were identified as insufficient security measures (0.079), land conditions (0.066), carelessness (0.062), morale (0.056) and allergic plants (0.049), respectively. The priority order of the risk criteria will shed light on employers in preparing the necessary precaution plans.

[1]  Selçuk Gümüş,et al.  Odun Hammaddesi Üretim İşçilerinde Bazi Sağlik ve Güvenlik Verilerinin Tespitine Yönelik Bir Araştirma , 2012 .

[2]  Murat Gunduz,et al.  Safety risk assessment using analytic hierarchy process (AHP) during planning and budgeting of construction projects. , 2013, Journal of safety research.

[3]  N. Ismail,et al.  Material selection of polymeric composite automotive bumper beam using analytical hierarchy process , 2010 .

[4]  Sushil Kumar,et al.  Analytic hierarchy process: An overview of applications , 2006, Eur. J. Oper. Res..

[5]  Sameh M. El-Sayegh,et al.  Project selection using the combined approach of AHP and LP , 2016 .

[6]  P. Lebailly,et al.  Determining Key Agricultural Strategic Factors Using AHP-MICMAC , 2019, Sustainability.

[7]  R. Russell,et al.  Operations Management: Quality and Competitiveness in a Global Environment , 1999 .

[8]  Kyung In Kang,et al.  A case-based reasoning cost estimating model using experience by analytic hierarchy process , 2007 .

[9]  Ezekiel Chinyio,et al.  Multi-criteria evaluation model for the selection of sustainable materials for building projects , 2013 .

[10]  Armin Scholl,et al.  Solving multiattribute design problems with analytic hierarchy process and conjoint analysis: An empirical comparison , 2005, Eur. J. Oper. Res..

[11]  Fatih Yilmaz,et al.  A Risk Analysis and Ranking Application for Lifting Vehicles Used in Construction Sites with Integrated AHP and Fine-Kinney Approach , 2019 .

[12]  Galen Newman,et al.  Utilizing the Analytic Hierarchy Process to Establish Weighted Values for Evaluating the Stability of Slope Revegetation based on Hydroseeding Applications in South Korea , 2016 .

[13]  Peter Kipruto Chemweno,et al.  Development of a risk assessment selection methodology for asset maintenance decision making: An analytic network process (ANP) approach , 2015 .

[14]  Remon Fayek Aziz Eskander,et al.  Risk assessment influencing factors for Arabian construction projects using analytic hierarchy process , 2018, Alexandria Engineering Journal.

[15]  T. Saaty How to Make a Decision: The Analytic Hierarchy Process , 1990 .

[16]  T. Padma,et al.  Knowledge based decision support system to assist work-related risk analysis in musculoskeletal disorder , 2009, Knowl. Based Syst..

[17]  Raimo P. Hämäläinen,et al.  Analyzing AHP-matrices by regression , 2003, Eur. J. Oper. Res..

[18]  Thomas L. Saaty,et al.  Rank from comparisons and from ratings in the analytic hierarchy/network processes , 2006, Eur. J. Oper. Res..

[19]  B Gopalkrishna,et al.  Risk Assessment Using AHP in South Indian Construction Companies: A Case Study , 2015 .

[20]  Nachiappan Subramanian,et al.  A review of applications of Analytic Hierarchy Process in operations management , 2012 .

[21]  Aviad Shapira,et al.  AHP-Based Equipment Selection Model for Construction Projects , 2005 .

[22]  Alessio Ishizaka,et al.  Analytic Hierarchy Process and Expert Choice: Benefits and limitations , 2009, OR Insight.

[23]  Tarek Zayed,et al.  Assessing risk and uncertainty inherent in Chinese highway projects using AHP , 2008 .

[24]  Svetlana Nikolicic,et al.  EVALUATION CRITERIA OF THE BELT CONVEYOR USING THE AHP METHOD AND SELECTION THE RIGHT CONVEYOR BY HURWITZ METHOD , 2018, Advances in Science and Technology Research Journal.

[25]  Sarfaraz Ahmed,et al.  Prioritization of pavement maintenance sections using objective based Analytic Hierarchy Process , 2017 .

[26]  Youn Chul Choi,et al.  Analytic Hierarchy Process Approach for Identifying Relative Importance of Factors to Improve Passenger Security Checks at Airports , 2006 .

[27]  Shi-Ming Huang,et al.  Assessing risk in ERP projects: identify and prioritize the factors , 2004, Ind. Manag. Data Syst..

[28]  Patrick X.W. Zou,et al.  Risk identification and assessment in subway projects: case study of Nanjing Subway Line 2 , 2010 .

[29]  Pratap K.J. Mohapatra,et al.  Prioritization of rural roads: AHP in group decision , 2010 .

[30]  A Davoodi,et al.  ON INCONSISTENCY OF A PAIRWISE COMPARISON MATRIX , 2009 .

[31]  Bernard W. Taylor,et al.  Introduction to Management Science , 2006 .

[32]  Dongping Fang,et al.  Safety Risk Identification and Assessment for Beijing Olympic Venues Construction , 2008 .

[33]  Xiaomin Lu,et al.  Application of AHP to Road Selection , 2020, ISPRS Int. J. Geo Inf..

[34]  Andrew R.J. Dainty,et al.  Establishing and weighting decision criteria for building system selection in housing construction , 2012 .

[35]  Valentinas Podvezko,et al.  Integrated Determination of Objective Criteria Weights in MCDM , 2016, Int. J. Inf. Technol. Decis. Mak..

[36]  Sameh M. El-Sayegh,et al.  Multi‐criteria decision support model for selecting the appropriate construction management at risk firm , 2009 .