暂无分享,去创建一个
[1] Jeffrey W. Herrmann,et al. Rescheduling Manufacturing Systems: A Framework of Strategies, Policies, and Methods , 2003, J. Sched..
[2] James C. Bean,et al. Matchup Scheduling with Multiple Resources, Release Dates and Disruptions , 1991, Oper. Res..
[3] Chung-Yee Lee,et al. Machine scheduling with an availability constraint , 1996, J. Glob. Optim..
[4] Xiangtong Qi,et al. Disruption management in production planning , 2005 .
[5] Jinjiang Yuan,et al. Pareto optimization of rescheduling with release dates to minimize makespan and total sequence disruption , 2013, J. Sched..
[6] Jan Van Damme,et al. Project scheduling under uncertainty survey and research potentials , 2002 .
[7] Reha Uzsoy,et al. Executing production schedules in the face of uncertainties: A review and some future directions , 2005, Eur. J. Oper. Res..
[8] Chris N. Potts,et al. Rescheduling for New Orders , 2004, Oper. Res..
[9] Jinjiang Yuan,et al. Rescheduling with release dates to minimize makespan under a limit on the maximum sequence disruption , 2007, Eur. J. Oper. Res..
[10] T. C. Edwin Cheng,et al. Rescheduling on identical parallel machines with machine disruptions to minimize total completion time , 2016, Eur. J. Oper. Res..
[11] V. T’kindt,et al. Rescheduling for new orders on a single machine with setup times , 2009 .
[12] Chris N. Potts,et al. Rescheduling for Job Unavailability , 2010, Oper. Res..
[13] Zhixin Liu,et al. Rescheduling for machine disruption to minimize makespan and maximum lateness , 2014, J. Sched..
[14] Monte Zweben,et al. Scheduling and rescheduling with iterative repair , 1993, IEEE Trans. Syst. Man Cybern..
[15] Chris N. Potts,et al. Rescheduling for Multiple New Orders , 2007, INFORMS J. Comput..
[16] E.L. Lawler,et al. Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey , 1977 .