On strain change of prestressing strand during detensioning procedures
暂无分享,去创建一个
[1] Angel C. Aparicio,et al. Testing of externally prestressed concrete beams , 2002 .
[2] Lan Chung,et al. Correction factor suggestion for ACI development length provisions based on flexural testing of RC slabs with various levels of corroded reinforcing bars , 2004 .
[3] Angel C. Aparicio,et al. Response of under-deck cable-stayed bridges to the accidental breakage of stay cables , 2009 .
[4] Hung-Liang Roger Chen,et al. MEASUREMENT OF TENSILE FORCES IN A SEVEN-WIRE PRESTRESSING STRAND USING STRESS WAVES , 2001 .
[5] Ehab Ellobody,et al. Fire tests on bonded post-tensioned concrete slabs , 2009 .
[6] N. Burns,et al. Experimental Assessment of Factors Affecting Transfer Length , 2003 .
[7] In Hwan Yang,et al. Prediction of time-dependent effects in concrete structures using early measurement data , 2007 .
[8] Hamid Bahai,et al. Friction-slip : An efficient energy dissipating mechanism for suddenly released prestressing bars , 2001 .
[9] S. Machida,et al. Response of a Strand to Axial and Torsional Displacements , 1973 .
[10] Henryk K Stolarski,et al. Release methodology of strands to reduce end cracking in pretensioned concrete girders , 1997 .
[11] Yeoshua Frostig,et al. Free vibrations of cracked prestressed concrete beams , 2004 .
[12] Antonio Nanni,et al. Bond Anchorage of Pretensioned FRP Tendon at Force Release , 1992 .
[13] Arnaud Castel,et al. Corroded post-tensioned beams with bonded tendons and wire failure , 2009 .
[14] Edwin G. Burdette,et al. DEVELOPMENT LENGTH AND LATERAL SPACING REQUIREMENTS OF PRESTRESSING STRAND FOR PRESTRESSED CONCRETE BRIDGE GIRDERS , 1994 .
[15] Ned H. Burns,et al. Measured transfer lengths of 0.5 and 0.6 in. strands in pretensioned concrete , 1996 .
[16] Shad M. Sargand,et al. EFFECTS OF SUDDEN PRESTRESS FORCE TRANSFER IN PRETENSIONED CONCRETE BEAMS , 2001 .
[17] David W Johnston,et al. Transfer and Development Length of Epoxy Coated and Uncoated Prestressing Strand , 1990 .
[18] Ned H. Burns,et al. Measurement of Transfer Lengths on Pretensioned Concrete Elements , 1997 .
[19] J F Mirza,et al. END CRACKING IN PRESTRESSED MEMBERS DURING DETENSIONING , 1978 .
[20] B. Oh,et al. REALISTIC EVALUATION OF TRANSFER LENGTHS IN PRETENSIONED, PRESTRESSED CONCRETE MEMBERS , 2000 .
[21] Arnaud Castel,et al. Response of post-tensioned concrete beams with unbonded tendons including serviceability and ultimate state , 2010 .