A predictive model for the throughput of simple assembly systems
暂无分享,去创建一个
[1] Marcel F. Neuts,et al. Matrix-Geometric Solutions in Stochastic Models , 1981 .
[2] N. P. Rao,et al. A viable alternative to the ‘method of stages’ solution of series production systems with Erlang service times , 1976 .
[3] Eginhard J. MUTHf,et al. The throughput rate of three-station production lines: a unifying solution , 1987 .
[4] Frederick S. Hillier,et al. Finite Queues in Series with Exponential or Erlang Service Times - A Numerical Approach , 1966, Oper. Res..
[5] Eginhard J. Muth,et al. Stochastic processes and their network representations associated with a production line queuing model , 1984 .
[6] Howard L. Jones,et al. Exact Lower Moments of Order Statistics in Small Samples from a Normal Distribution , 1948 .
[7] William L. Maxwell,et al. The Role of Work-in-Process Inventory in Serial Production Lines , 1988, Oper. Res..
[8] K. Knott. A Study of Work-Time Distributions on Unpaced Tasks , 1987 .
[9] Gordon C. Hunt,et al. Sequential Arrays of Waiting Lines , 1956 .
[10] de Ag Ton Kok,et al. Computationally efficient approximations for balanced flowlines with finite intermediate buffers , 1990 .
[11] Nori Prakasa Rao,et al. On the mean production rate of a two-stage production system of the tandem type , 1975 .
[12] F. Hillier,et al. On the Optimal Allocation of Work in Symmetrically Unbalanced Production Line Systems with Variable Operation Times , 1979 .
[13] E. Muth. The production rate of a series of work stations with variable service times , 1973 .
[14] T. Altiok. On the Phase-Type Approximations of General Distributions , 1985 .
[15] Kelvin C. W. So,et al. The effect of the coefficient of variation of operation times on the allocation of storage space in , 1991 .
[16] Stephen G. Powell,et al. Optimal Allocation of Work in Assembly Systems , 1993 .