Applying Six Sigma to Quality Improvement in Construction

AbstractTaiwan is in a seismically active zone because it is located in the earthquake-prone Pacific ring of fire. The cracks in lightweight partition walls caused by frequent earthquakes decrease customer satisfaction and increase repair costs in the case company. This research demonstrates how a Six Sigma team can determine and improve the key input variables affecting the cracks in lightweight partition walls. A case study methodology is used in this research to illustrate the tools of Six Sigma by using the project charter to define problems, by using tools of process mapping to display all the input and output variables affecting cracks in lightweight partition walls, by using the C&E (cause-and-effect) Matrix to select highly correlated input variables, and by using failure modes and effects analysis (FMEA) to identify causes of the cracks. Unlike conventional Six Sigma, finite-element analysis (FEA) simulation software ABAQUS was used instead of statistical tools to verify variables and to identify...

[1]  Greg Brue,et al.  Design for Six Sigma , 2005 .

[2]  Matthew Hu,et al.  Leveraging Six Sigma disciplines to drive improvement , 2005 .

[3]  M. J. Harry,et al.  SIX SIGMA : A BREAKTHROUGH STRATEGY FOR PROFITABILITY , 1998 .

[4]  Mohamed Gamal Aboelmaged,et al.  Six Sigma quality: a structured review and implications for future research , 2010 .

[5]  Thomas D. McCarty,et al.  Six sigma: it is not what you think , 2007 .

[6]  Jiju Antony,et al.  Six sigma for service processes , 2006, Bus. Process. Manag. J..

[7]  Douglas C. Montgomery,et al.  Introduction to Statistical Quality Control , 1986 .

[8]  Ahmad K. Elshennawy Quality in the New Age and the Body of Knowledge for Quality Engineers , 2004 .

[9]  R. Andersson,et al.  Similarities and differences between TQM, six sigma and lean , 2006 .

[10]  Douglas C. Montgomery,et al.  An Overview of Six Sigma , 2008 .

[11]  Roger W. Hoerl,et al.  Six Sigma Black Belts: What Do They Need to Know? , 2001 .

[12]  Jiju Antony,et al.  An Application of Six Sigma to Reduce Waste , 2005 .

[13]  Charles F. Larson Industrial Research Institute's 9th Annual R&D Leaderboard , 2005 .

[14]  Jiju Antony,et al.  Key ingredients for the effective implementation of Six Sigma program , 2002 .

[15]  R. Rajagopalan,et al.  Developing Novel Catalysts with Six Sigma , 2004 .

[16]  Loon Ching Tang,et al.  Fortification of Six Sigma: expanding the DMAIC toolset , 2007, Qual. Reliab. Eng. Int..

[17]  James R. Evans,et al.  Successful implementation of Six Sigma: benchmarking General Electric Company , 2000 .

[18]  Mahesh S. Raisinghani,et al.  Six Sigma: concepts, tools, and applications , 2005, Ind. Manag. Data Syst..