Approach of Integrating Ancillary Services into a medium-term Hydro Optimization
暂无分享,去创建一个
[1] D. Kirschen,et al. A Survey of Frequency and Voltage Control Ancillary Services—Part II: Economic Features , 2007, IEEE Transactions on Power Systems.
[2] S.-J. Deng,et al. Optimal Scheduling of Hydro-Electric Power Generation with Simultaneous Participation in Multiple Markets , 2006, 2006 IEEE PES Power Systems Conference and Exposition.
[3] M. Shahidehpour,et al. GENCO's Risk-Constrained Hydrothermal Scheduling , 2008, IEEE Transactions on Power Systems.
[4] Zvonko Bregar. Three utilization patterns of the renovated Moste hydro power plant on an electricity market of power and ancillary services , 2007 .
[5] A. Gjelsvik,et al. Generation scheduling in a deregulated system. The Norwegian case , 1999 .
[6] Pedro Faria,et al. Ancillary services dispatch using Linear Programming and Genetic Algorithm approaches , 2010, Melecon 2010 - 2010 15th IEEE Mediterranean Electrotechnical Conference.
[7] John W. Labadie,et al. Optimal Operation of Multireservoir Systems: State-of-the-Art Review , 2004 .
[8] John D. C. Little,et al. The Use of Storage Water in a Hydroelectric System , 1955, Oper. Res..
[9] S.J. Kazempour,et al. Self-scheduling of a joint hydro and pumped-storage plants in energy, spinning reserve and regulation markets , 2009, 2009 IEEE Power & Energy Society General Meeting.
[10] S. Wallace,et al. Stochastic Programming Models in Energy , 2003 .
[11] A. Ugedo,et al. Validation of a strategic bidding model within the Spanish sequential electricity market , 2010, 2010 IEEE 11th International Conference on Probabilistic Methods Applied to Power Systems.
[12] P. Schrimpf,et al. Dynamic Programming , 2011 .
[13] P. Luh,et al. Optimal integrated generation bidding and scheduling with risk management under a deregulated daily power market , 2002, 2002 IEEE Power Engineering Society Winter Meeting. Conference Proceedings (Cat. No.02CH37309).