Profit Maximization by Integrating Production Planning, Maintenance Scheduling, Quality Aspects and Sale Decisions
暂无分享,去创建一个
Michel Gendreau | Mustapha Nourelfath | Hossein Beheshti Fakher | M. Gendreau | M. Nourelfath | H. B. Fakher
[1] Yu Zheng,et al. Integrating production planning and maintenance: an iterative method , 2014, Ind. Manag. Data Syst..
[2] Kjetil K. Haugen,et al. The profit maximizing capacitated lot-size (PCLSP) problem , 2007, Eur. J. Oper. Res..
[3] T. C. Edwin Cheng,et al. Single-machine scheduling with periodic maintenance to minimize makespan , 2007, Comput. Oper. Res..
[4] Yisha Xiang,et al. Joint optimization of X¯ control chart and preventive maintenance policies: A discrete-time Markov chain approach , 2013, Eur. J. Oper. Res..
[5] Anis Gharbi,et al. Age-dependent production planning and maintenance strategies in unreliable manufacturing systems with lost sale , 2007, Eur. J. Oper. Res..
[6] Neale R. Smith,et al. A profit-maximizing economic lot scheduling problem with price optimization , 2008, Eur. J. Oper. Res..
[7] M. A. Rahim. JOINT DETERMINATION OF PRODUCTION QUANTITY, INSPECTION SCHEDULE, AND CONTROL CHART DESIGN , 1994 .
[8] Wen-Ying Wang,et al. Optimum production and inspection modeling with minimal repair and rework considerations , 2013 .
[9] Chang Sup Sung,et al. Optimal production policy for a single-product single-machine problem with intermediate machine inspection allowed , 1992 .
[10] Ali Gharbi,et al. Joint production and major maintenance planning policy of a manufacturing system with deteriorating quality , 2013 .
[11] Divya Pandey,et al. A methodology for joint optimization for maintenance planning, process quality and production scheduling , 2011, Comput. Ind. Eng..
[12] S.M.A. Suliman,et al. Optimization of preventive maintenance schedule and production lot size , 2012 .
[13] C. Richard Cassady,et al. Integrating preventive maintenance planning and production scheduling for a single machine , 2005, IEEE Transactions on Reliability.
[14] Ali Gharbi,et al. Joint optimal production control/preventive maintenance policy for imperfect process manufacturing cell , 2012 .
[15] T. Nakagawa. A summary of imperfect preventive maintenance policies with minimal repair , 1980 .
[16] Robert Pellerin,et al. Joint optimal lot sizing and production control policy in an unreliable and imperfect manufacturing system , 2013 .
[17] Srinivas Kumar Pinjala,et al. An empirical investigation on the relationship between business and maintenance strategies , 2006 .
[18] Mustapha Nourelfath,et al. Integrating noncyclical preventive maintenance scheduling and production planning for a single machine , 2012 .
[19] Burak Kazaz,et al. The impact of process deterioration on production and maintenance policies , 2013, Eur. J. Oper. Res..
[20] El Houssaine Aghezzaf,et al. An integrated production and preventive maintenance planning model , 2007, Eur. J. Oper. Res..
[21] David F. Percy,et al. Determining economical maintenance intervals , 2000 .
[22] M. A. Rahim,et al. Economic design of x -control charts under Weibull shock models , 1988 .
[23] Mustapha Nourelfath,et al. An aggregation method for performance evaluation of a tandem homogenous production line with machines having multiple failure modes , 2010, Reliab. Eng. Syst. Saf..
[24] L. Gavrilov,et al. The reliability theory of aging and longevity. , 2001, Journal of theoretical biology.
[25] Shib Sankar Sana,et al. A mathematical model on EPQ for stochastic demand in an imperfect production system , 2013 .
[26] C. Richard Cassady,et al. Minimizing Job Tardiness Using Integrated Preventive Maintenance Planning and Production Scheduling , 2003 .