Strategic design of cost savings guarantee in energy performance contracting under uncertainty

Among the key barriers to profit in Energy Performance Contracting (EPC) are uncertainties about attaining the realized energy cost savings and potential disputes over the guaranteed cost savings. In this paper, a methodology has been proposed to assist the Energy Service Company (ESCO): (1) to evaluate the risk threshold if the guarantee has already been made, and (2) to determine the guarantee design, if the guarantee has not been made yet, that not only promises the ESCO’s profitability from EPC but also maintains its competitiveness to win the bid. Uncertainties within the energy cost savings are modeled stochastically using Monte-Carlo simulation, taking both the energy price fluctuation and the facility performance variability into account. Based on that, a strategic energy savings guarantee design curve is derived, that all the points on it would return as appropriate guarantees. Finally, a campus case is presented to demonstrate the applicability for finding the appropriate guaranteed savings value. This method is also worth popularizing in similar performance-based projects.

[1]  Daeyeol Lee Game theory and neural basis of social decision making , 2008, Nature Neuroscience.

[2]  Donald Gilligan,et al.  A Survey of the U.S. ESCO Industry: Market Growth and Development from 2000 to 2006 , 2007 .

[3]  Eleni Kaplani,et al.  A stochastic simulation model for reliable PV system sizing providing for solar radiation fluctuations , 2012 .

[4]  Patrik Thollander,et al.  Beyond barriers - A case study on driving forces for improved energy efficiency in the foundry industries in Finland, France, Germany, Italy, Poland, Spain, and Sweden , 2013 .

[5]  Carol C. Menassa,et al.  Evaluating sustainable retrofits in existing buildings under uncertainty , 2011 .

[6]  Shmuel S. Oren,et al.  Integrating real and financial options in demand-side electricity contracts , 2001, Decis. Support Syst..

[7]  Stein-Erik Fleten,et al.  Linepack storage valuation under price uncertainty , 2013 .

[8]  F. W. H. Yik,et al.  Partnership in building energy performance contracting , 2004 .

[9]  Yadollah Saboohi,et al.  Stochastic modeling of the energy supply system with uncertain fuel price – A case of emerging technologies for distributed power generation , 2012 .

[10]  C. Goldman,et al.  Option value of electricity demand response , 2005 .

[11]  Carolyn J. Heinrich,et al.  Administration the American Review of Public Performance-based Contracting in Social Welfare Programs on Behalf Of: American Society for Public Administration Performance-based Contracting in Social Welfare Programs Study Objectives and Approach Theoretical Models of Government Contracting Incomplet , 2022 .

[12]  Fen-May Liou,et al.  Automated Approach to Negotiations of BOT Contracts with the Consideration of Project Risk , 2008 .

[13]  Ka Chi Lam,et al.  A Decision Support System for the determination of concession period length in transportation project under BOT contract , 2013 .

[14]  Jean-Claude Hennet,et al.  Supply chain coordination: A game-theory approach , 2008, Eng. Appl. Artif. Intell..

[15]  Edwin H.W. Chan,et al.  Success factors of energy performance contracting (EPC) for sustainable building energy efficiency retrofit (BEER) of hotel buildings in China , 2011 .

[16]  Kenichi Wada,et al.  Energy efficiency opportunities in the residential sector and their feasibility , 2012 .

[17]  Yeonsook Heo,et al.  Calibration of building energy models for retrofit analysis under uncertainty , 2012 .

[18]  Michael J. Garvin,et al.  Valuation techniques for infrastructure investment decisions , 2004 .

[19]  Chao Fang,et al.  A simulation-based risk network model for decision support in project risk management , 2012, Decis. Support Syst..

[20]  Daniel Dufresne The integral of geometric Brownian motion , 2001 .

[21]  Mohammad. Rasul,et al.  Thermal-comfort analysis and simulation for various low-energy cooling-technologies applied to an office building in a subtropical climate , 2008 .

[22]  T. C. Edwin Cheng,et al.  Coordination of supply chains by option contracts: A cooperative game theory approach , 2010, Eur. J. Oper. Res..

[23]  Xueqing Zhang,et al.  Win–Win Concession Period Determination Methodology , 2009 .

[24]  Kaveh Madani,et al.  Game theory and water resources , 2010 .

[25]  L. E. Brandão,et al.  The option value of government guarantees in infrastructure projects , 2008 .

[26]  C. Y. Cheah,et al.  Valuing governmental support in infrastructure projects as real options using Monte Carlo simulation , 2006 .

[27]  Evangelos Grigoroudis,et al.  Performance study of a multi-objective mathematical programming modelling approach for energy decision-making in buildings , 2013 .

[28]  Qianli Deng,et al.  A simulation-based decision model for designing contract period in building energy performance contracting , 2014 .

[29]  Charles Goldman,et al.  Review of US ESCO industry market trends: an empirical analysis of project data , 2003 .

[30]  F. Medda A game theory approach for the allocation of risks in transport public private partnerships , 2007 .

[31]  S. T. Ng,et al.  A simulation model for optimizing the concession period of public-private partnerships schemes , 2007 .

[32]  Moawia Alghalith Energy price uncertainty and the manufacturing sector , 2010 .

[33]  Gonzalo Cortazar,et al.  Implementing a stochastic model for oil futures prices , 2003 .

[34]  Michael J. Garvin,et al.  Valuing Simple Multiple-Exercise Real Options in Infrastructure Projects , 2007 .

[35]  Michael D. Sohn,et al.  Uncertainty estimation improves energy measurement and verification procedures , 2014 .

[36]  R. Madlener,et al.  Evaluation of Economically Optimal Retrofit Investment Options for Energy Savings in Buildings , 2011 .

[37]  Charles Goldman,et al.  Market trends in the U.S. ESCO industry: Results from the NAESCO database project , 2002 .

[38]  Patrick T.I. Lam,et al.  Preferred risk allocation in Chinas publicprivate partnership (PPP) projects , 2010 .

[39]  Edward Vine,et al.  An international survey of the energy service company (ESCO) industry , 2005 .

[41]  Ludger Rüschendorf,et al.  Allocation of risks and equilibrium in markets with finitely many traders , 2008 .

[42]  John Chapin,et al.  Performance-based contracting in Wisconsin public health: transforming state-local relations. , 2002, The Milbank quarterly.

[43]  John E. Taylor,et al.  Modeling building occupant network energy consumption decision-making: The interplay between network structure and conservation , 2012 .

[44]  S. Myers Determinants of corporate borrowing , 1977 .

[45]  Robert L. K. Tiong,et al.  NPV-at-Risk Method in Infrastructure Project Investment Evaluation , 2000 .

[46]  Teuku Meurah Indra Mahlia,et al.  Modeling and simulation of the energy use in an occupied residential building in cold climate , 2012 .

[47]  Julie Osborn,et al.  Assessing U.S. ESCO industry performance and market trends: Results from the NAESCO database project , 2002 .

[48]  Cheng Tian,et al.  Experimental and simulating examination of computer tools, Radlink and DOE2, for daylighting and energy simulation with venetian blinds , 2014 .

[49]  Li yin Shen,et al.  Risk Concession Model for Build/Operate/Transfer Contract Projects , 2005 .

[50]  Makarand Hastak,et al.  Valuing the Warranty Ceiling Clause on New Mexico Highway 44 Using a Binomial Lattice Model , 2008 .

[51]  David N. Ford,et al.  A real options approach to valuing strategic flexibility in uncertain construction projects , 2002 .

[52]  Yu-Lin Huang,et al.  Valuation of the minimum revenue guarantee and the option to abandon in BOT infrastructure projects , 2006 .

[53]  The guarantee option against the construction cost overruns of nuclear power plant: Monte Carlo simulation approach , 2010 .

[54]  J. Reneke A game theory formulation of decision making under conditions of uncertainty and risk , 2009 .

[55]  S. Sorrell The economics of energy service contracts , 2007 .

[56]  Gregor P. Henze,et al.  Uncertainty quantification for combined building performance and cost-benefit analyses , 2013 .