Optimizing construction planning schedules by virtual prototyping enabled resource analysis

The inherent uncertainty and complexity of construction work make construction planning a particularly difficult task for project managers due to the need to anticipate and visualize likely future events. Conventional computer-assisted technology can help but is often limited to the constructability issues involved. Virtual prototyping, however, offers an improved method through the visualization of construction activities by computer simulation — enabling a range of ‘what-if’ questions to be asked and their implications on the total project to be investigated. This paper describes the use of virtual prototyping to optimize construction planning schedules by analyzing resource allocation and planning with integrated construction models, resource models, construction planning schedules and site-layout plans. A real-life case study is presented that demonstrates the use of a virtual prototyping enabled resource analysis to reallocate space, logistic on access road and arrange tower cranes to achieve a 6-day floor construction cycle.

[1]  Jian-Ping Zhang,et al.  Application of 4D for dynamic site layout and management of construction projects , 2005 .

[2]  Andrew N. Baldwin,et al.  A virtual prototyping system for simulating construction processes , 2007 .

[3]  Osama Moselhi,et al.  Computer-aided site layout planning , 2006 .

[4]  Tarek Hegazy,et al.  Optimization of Resource Allocation and Leveling Using Genetic Algorithms , 1999 .

[5]  Peter E.D. Love,et al.  Using improved genetic algorithms to facilitate time-cost optimization , 1997 .

[6]  Iris D. Tommelein,et al.  Time-space tradeoff strategies for space-schedule construction , 1994 .

[7]  Burcu Akinci,et al.  Simulation-Based Identification of Possible Locations for Mobile Cranes on Construction Sites , 2008 .

[8]  Andrew N. Baldwin,et al.  Integrating design and construction through virtual prototyping , 2008 .

[9]  Bonsang Koo,et al.  Feasibility study of 4D CAD in commercial construction , 2002 .

[10]  Jian-Ping Zhang,et al.  Implementation of visualization as planning and scheduling tool in construction , 2003 .

[11]  Miroslaw J. Skibniewski,et al.  Using the IKEA model and virtual prototyping technology to improve construction process management , 2008 .

[12]  Kwok-wing Chau,et al.  Four-dimensional visualization of construction scheduling and site utilization , 2004 .

[13]  Jian-Ping Zhang,et al.  4D Dynamic Management for Construction Planning and Resource Utilization , 2004 .

[14]  Tarek Hegazy,et al.  Resource Optimization Using Combined Simulation and Genetic Algorithms , 2003 .

[15]  Martin Fischer,et al.  Automated Generation of Work Spaces Required by Construction Activities , 2002 .

[16]  Mohamed Al-Hussein,et al.  Integrating 3D visualization and simulation for tower crane operations on construction sites , 2006 .

[17]  Iris D. Tommelein,et al.  SightPlan Model for Site Layout , 1992 .

[18]  Sou-Sen Leu,et al.  GA-BASED MULTICRITERIA OPTIMAL MODEL FOR CONSTRUCTION SCHEDULING , 1999 .

[19]  Walid Y. Thabet,et al.  A Virtual Construction Environment for preconstruction planning , 2003 .

[20]  Burcu Akinci,et al.  Formalization and Automation of Time-Space Conflict Analysis , 2002 .

[21]  Yvan J. Beliveau,et al.  Modeling Work Space to Schedule Repetitive Floors in Multistory Buildings , 1994 .

[22]  Tarek Hegazy,et al.  EvoSite: Evolution-Based Model for Site Layout Planning , 1999 .

[23]  Weng Tat Chan,et al.  CONSTRUCTION RESOURCE SCHEDULING WITH GENETIC ALGORITHMS , 1996 .