Adaptive observer for kick detection and switched control for bottomhole pressure regulation and kick attenuation during managed pressure drilling
暂无分享,去创建一个
Jing Zhou | Øyvind Breyholtz | G Nygaard | J Godhavn | E H Vefring | Jing Zhou | G. Nygaard | Øyvind Breyholtz | E. Vefring | John-Morten Godhavn
[1] Jing Zhou,et al. Pressure regulation with kick attenuation in a managed pressure drilling system , 2009, Proceedings of the 48h IEEE Conference on Decision and Control (CDC) held jointly with 2009 28th Chinese Control Conference.
[2] John-Morten Godhavn,et al. Evaluating control designs for co-ordinating pump rates and choke valve during managed pressure drilling operations , 2009, 2009 IEEE Control Applications, (CCA) & Intelligent Control, (ISIC).
[3] G. Nygaard,et al. Modelling two-phase flow for control design in oil well drilling , 2005, Proceedings of 2005 IEEE Conference on Control Applications, 2005. CCA 2005..
[4] N. P. Brown,et al. Slimhole Early Kick Detection by Real-Time Drilling Analysis , 1997 .
[5] S. I. Stokka,et al. Gas Kick Warner - An Early Gas Influx Detection Method , 1993 .
[6] Helio Santos,et al. Micro-Flux Control: The Next Generation in Drilling Process for Ultra-deepwater , 2003 .
[7] J. M. Speers,et al. Delta Flow: An Accurate, Reliable System for Detecting Kicks and Loss of Circulation During Drilling , 1987 .
[8] Jing Zhou,et al. Switched Control for Pressure Regulation and Kick Attenuation in a Managed Pressure Drilling System , 2011, IEEE Transactions on Control Systems Technology.
[9] Lars Imsland,et al. USING NMPC BASED ON A LOW-ORDER MODEL FOR CONTROLLING PRESSURE DURING OIL WELL DRILLING , 2007 .
[10] Don M. Hannegan,et al. MPD - Uniquely Applicable to Methane Hydrate Drilling , 2004 .
[11] Daniel Liberzon,et al. Switching in Systems and Control , 2003, Systems & Control: Foundations & Applications.
[12] Sigbjørn Sangesland,et al. Managed Pressure Drilling for Subsea Applications; Well Control Challenges in Deep Waters , 2004 .
[13] Celso Kazuyuki Morooka,et al. Kick Detection in Floating Drilling Rigs , 1997 .
[14] Michael Nikolaou,et al. Performing the Dynamic Shut-In Procedure Because of a Kick Incident When Using Automatic Coordinated Control of Pump Rates and Choke-Valve Opening , 2008 .
[15] Rolf Johan Lorentzen,et al. Tuning of Computer Model Parameters in Managed-Pressure Drilling Applications Using an Unscented-Kalman-Filter Technique , 2010 .
[16] John-Morten Godhavn. Control Requirements for High-End Automatic MPD Operations , 2009 .
[17] Jing Zhou,et al. Adaptive observer design for the bottomhole pressure of a managed pressure drilling system , 2008, 2008 47th IEEE Conference on Decision and Control.
[18] Jing Zhou,et al. Adaptive output feedback control of a managed pressure drilling system , 2008, 2008 47th IEEE Conference on Decision and Control.
[19] David Hargreaves,et al. Early Kick Detection for Deepwater Drilling: New Probabilistic Methods Applied in the Field , 2001 .
[20] Helio Santos,et al. Kick Detection and Control in Oil-based Mud: Real Well Test Results Using Micro-Flux Control Equipment , 2007 .
[21] Olav Gerhard Haukenes Nygaard,et al. Multivariable process control in high temperature and high pressure environment using non-intrusive multi sensor data fusion , 2006 .
[22] Michael Nikolaou,et al. Improved Kick Management During MPD by Real-Time Pore-Pressure Estimation , 2010 .