Position-optimization on retained entry and backfilling wall in gob-side entry retaining techniques

This study investigates the stability problem of gob-side entry retaining (GER) and backfilling wall which located under the key block B. Based on the combined research of elastic–plastic mechanics, structure mechanics and modern theory of mining-induced pressure, the caving characteristic and roof structure over the GER were analyzed, and the vertical force and the torque on retained entry roof were also derived as the position for the retained entry varies. On the basis of the specific geology in Huainan mining area, the results indicate that a relatively more stable position for retained entry neighbors the hinge point of block A and B, and it also located at a scope ranging from this point to the one-third length of block B in horizontal direction. As to appropriate position for backfilling wall, this study recommends partial-road-in backfilling method for GER. Field trial conducted at panel face 12418 of Xieqiao Mine demonstrates that the recommended width for original entry is 3.6 m and the preferred width proportion between original retained entry and original entry is 75 % or so whereas the avoidable one is 88 % or so. These findings provide qualitative references to the mines which share similar geology as what Huainan mining area characterized.

[1]  Si Guang-yao,et al.  Analysis of supporting resistance of backfilling wall for gob-side entry retaining under typical roof conditions , 2011 .

[2]  Bai Jian-biao,et al.  Development of Support Technology Beside Roadway in Goaf-Side Entry Retaining for Next Sublevel , 2004 .

[3]  Bai Jian,et al.  Control mechanism and support technique about gateway driven along goaf in fully mechanized top coal caving face , 2000 .

[4]  Zhang Dong,et al.  Simulation on Roof Activities of Gob-Side Entry Retaining in Fully-Mechanized Top-Coal Caving Faces , 2001 .

[5]  Zan Dong-feng,et al.  Technology of gob-side entry retaining on its original position in fully-mechanized coalface with solid material backfilling , 2011 .

[6]  Xiexing Miao,et al.  Technique of gob-side entry retaining with entry-in packing in fully-mechanized coalface with top-coal caving , 2004 .

[7]  Bo Zhang,et al.  Stability of coal pillar in gob-side entry driving under unstable overlying strata and its coupling support control technique , 2013 .

[8]  Xiaowei Feng,et al.  Serial decoupling of bolts in coal mine roadway supports , 2015, Arabian Journal of Geosciences.

[9]  Zhang Dong-sheng,et al.  Industrial Test of Road-In Packing for Gob-Side Entry Retaining in Fully-Mechanized Coalface with Top-Coal Caving , 2004 .

[10]  Fangtian Wang,et al.  Deformation failure mechanism and application of the backfill along the goaf-side retained roadway , 2013 .

[11]  Xuehua Li,et al.  Failure laws of narrow pillar and asymmetric control technique of gob-side entry driving in island coal face , 2013 .