A new paradigm for rule-based scheduling in the wafer probe centre

This paper addresses the scheduling problem in the wafer probe centre. The proposed approach is based on the dispatching rule, which is popularly used in the semiconductor manufacturing industry. Instead of designing new rules, this paper proposes a new paradigm to utilize these rules. The proposed paradigm formulates the dispatching process as a 2-D assignment problem with the consideration of information from multiple lots and multiple pieces of equipment in an integrated manner. Then, the dispatching decisions are made by maximizing the gains of multiple possible decisions simultaneously. Besides, we develop a genetic algorithm (GA) for generating good dispatching rules through combining multiple rules with linear weighted summation. The benefits of the proposed paradigm and GA are verified with a comprehensive simulation study on three due-date-based performance measures. The experimental results show that under the proposed paradigm, the dispatching rules and GA can perform much better than under the traditional paradigm.

[1]  Pravin K. Johri,et al.  Practical issues in scheduling and dispatching in semiconductor wafer fabrication , 1993 .

[2]  Kimberly P. Ellis,et al.  Scheduling of wafer test processes in semiconductor manufacturing , 2004 .

[3]  W. L. Pearna,et al.  A case study on the multistage IC final testing scheduling problem with reentry , 2004 .

[4]  Ching-Chin Chern,et al.  Family-based scheduling rules of a sequence-dependent wafer fabrication system , 2003 .

[5]  S.C.H. Lu,et al.  Efficient scheduling policies to reduce mean and variance of cycle-time in semiconductor manufacturing plants , 1994 .

[6]  Shu Li,et al.  Minimum inventory variability schedule with applications in semiconductor fabrication , 1996 .

[7]  Shu-Hsing Chung,et al.  The wafer probing scheduling problem (WPSP) , 2002, J. Oper. Res. Soc..

[8]  John W. Fowler,et al.  A combined dispatching criteria approach to scheduling semiconductor manufacturing systems , 2001 .

[9]  Li-Chen Fu,et al.  Petri-net and GA-based approach to modeling, scheduling, and performance evaluation for wafer fabrication , 2000, IEEE Trans. Robotics Autom..

[10]  David E. Goldberg,et al.  Genetic Algorithms in Search Optimization and Machine Learning , 1988 .

[11]  Lifeng Xi,et al.  The impact of release times, lot size, and scheduling policy in an A&T facility , 2006 .

[12]  Chun-Hung Chen,et al.  Scheduling semiconductor wafer fabrication by using ordinal optimization-based simulation , 2001, IEEE Trans. Robotics Autom..

[13]  Yuehwern Yih,et al.  Selection of dispatching rules on multiple dispatching decision points in real-time scheduling of a semiconductor wafer fabrication system , 2003 .

[14]  K. Appleton-Day,et al.  Real-time dispatch gets real-time results in AMD's Fab 25 , 1997, 1997 IEEE/SEMI Advanced Semiconductor Manufacturing Conference and Workshop ASMC 97 Proceedings.

[15]  Tsu-Shuan Chang,et al.  Multiobjective scheduling for IC sort and test with a simulation testbed , 1998, ICMTS 1998.

[16]  Yeong-Dae Kim,et al.  Production scheduling in a semiconductor wafer fabrication facility producing multiple product types with distinct due dates , 2001, IEEE Trans. Robotics Autom..

[17]  Young Hoon Lee,et al.  Experimental study on input and bottleneck scheduling for a semiconductor fabrication line , 2002 .

[18]  Reha Uzsoy,et al.  A review of production planning and scheduling models in the semiconductor industry , 1994 .

[19]  Yi-Feng Hung,et al.  A simulation study of dispatch rules for reducing flow times in semiconductor wafer fabrication , 1998 .

[20]  Houmin Yan,et al.  Efficient setup/dispatching policies in a semiconductor manufacturing facility , 1999, Proceedings of the 38th IEEE Conference on Decision and Control (Cat. No.99CH36304).

[21]  S.-C. Huang,et al.  An interactive scheduler for a wafer probe centre in semiconductor manufacturing , 1998 .

[22]  J. T. Lin,et al.  A parameterized-dispatching rule for a Logic IC sort in a wafer fabrication , 2005 .

[23]  Gary Nicholson,et al.  Better Dispatch Application- a Success Story , 1998 .

[24]  Yeong-Dae Kim,et al.  Due-date based scheduling and control policies in a multiproduct semiconductor wafer fabrication facility , 1998 .

[25]  Oliver Rose Comparison of Due-date Oriented Dispatch Rules in Semiconductor Manufacturing , 2003 .

[26]  Oliver Rose,et al.  Some issues of the critical ratio dispatch rule in semiconductor manufacturing , 2002, Proceedings of the Winter Simulation Conference.

[27]  D. E. Goldberg,et al.  Genetic Algorithms in Search , 1989 .

[28]  Hyun Joong Yoon,et al.  A control method to reduce the standard deviation of flow time in wafer fabrication , 2000 .

[29]  Lee Dong-Ho,et al.  A SIMULATION STUDY ON LOT RELEASE CONTROL, MASK SCHEDULING, AND BATCH SCHEDULING IN SEMICONDUCTOR WAFER FABRICATION FACILITIES , 1998 .

[30]  Han S. Kim,et al.  Forward/inverse force transmission capability analyses of fully parallel manipulators , 2001, IEEE Trans. Robotics Autom..

[31]  Reha Uzsoy,et al.  A REVIEW OF PRODUCTION PLANNING AND SCHEDULING MODELS IN THE SEMICONDUCTOR INDUSTRY PART I: SYSTEM CHARACTERISTICS, PERFORMANCE EVALUATION AND PRODUCTION PLANNING , 1992 .

[32]  Tsu-Shuan Chang,et al.  Scheduling for IC sort and test with preemptiveness via Lagrangian relaxation , 1995, IEEE Trans. Syst. Man Cybern..

[33]  Dimitri P. Bertsekas,et al.  Linear network optimization - algorithms and codes , 1991 .

[34]  Reha Uzsoy,et al.  Decomposition methods for scheduling semiconductor testing facilities , 1996 .

[35]  Loon Ching Tang,et al.  Dispatching heuristic for wafer fabrication , 2001, Proceeding of the 2001 Winter Simulation Conference (Cat. No.01CH37304).

[36]  Myoungsoo Ham,et al.  Dynamic photo stepper dispatching/scheduling in wafer fabrication , 2005, ISSM 2005, IEEE International Symposium on Semiconductor Manufacturing, 2005..