A Split System Approach (SSA) based methodology is presented to assist in making optimal Preventive Maintenance decisions for serial production lines. The methodology treats a production line as a complex series system with multiple PM actions over multiple intervals. Both risk related cost and maintenance related cost are factored into the methodology as either deterministic or random variables. This SSA based methodology enables Asset Management (AM) decisions to be optimized considering a variety of factors including failure probability, failure cost, maintenance cost, PM performance, and the type of PM strategy. The application of this new methodology and an evaluation of the effects of these factors on PM decisions are demonstrated using an example. The results of this work show that the performance of a PM strategy can be measured by its Total Expected Cost Index (TECI). The optimal PM interval is dependent on TECI, PM performance and types of PM strategies. These factors are interrelated. Generally it was found that a trade-off between reliability and the number of PM actions needs to be made so that one can minimize Total Expected Cost (TEC) for asset maintenance
[1]
Yves Dallery,et al.
An improved decomposition method for the analysis of production lines with unreliable machines and finite buffers
,
1999
.
[2]
Lin Ma,et al.
Reliability Prediction of Repairable Systems for Single Component Repair
,
2004
.
[3]
A. Kelly.
Maintenance Planning and Control
,
1984
.
[4]
Charles E Ebeling,et al.
An Introduction to Reliability and Maintainability Engineering
,
1996
.
[5]
G. Goncalves,et al.
A genetic approach to the scheduling of preventive maintenance tasks on a single product manufacturing production line
,
2001
.
[6]
John Miltenburg,et al.
The effect of breakdowns on U-shaped production lines
,
2000
.
[7]
Panagiotis H. Tsarouhas,et al.
Reliability analysis of an automated pizza production line
,
2005
.
[8]
Mario T. Tabucanon,et al.
A multicriteria approach to the selection of preventive maintenance intervals
,
1997
.
[9]
Khairy A.H. Kobbacy,et al.
Setting preventive maintenance schedules when data are sparse
,
1997
.