Selection of financing strategies with a risk-averse supplier in a capital-constrained supply chain
暂无分享,去创建一个
[1] R. Rajan,et al. What Do We Know About Capital Structure? Some Evidence from International Data , 1994 .
[2] R. Rockafellar,et al. Optimization of conditional value-at risk , 2000 .
[3] Tsan-Ming Choi,et al. Mean-variance analysis of a single supplier and retailer supply chain under a returns policy , 2008, Eur. J. Oper. Res..
[4] Xiaohong Chen,et al. Stackelberg Game of Buyback Policy in Supply Chain with a Risk-Averse Retailer and a Risk-Averse Supplier Based on CVaR , 2014, PloS one.
[5] Xiangfeng Chen,et al. Equilibrium Financing in a Distribution Channel with Capital Constraint , 2012 .
[6] P. Honohan. Institute for International Integration Studies Partial Credit Guarantees: Principles and Practice Partial Credit Guarantees: Principles and Practice , 2022 .
[7] Frank Y. Chen,et al. A Risk-Averse Newsvendor Model under CVaR Decision Criterion , 2009 .
[8] Tunay I. Tunca,et al. Improving Channel Efficiency through Financial Guarantees by Large Supply Chain Participants , 2017, Found. Trends Technol. Inf. Oper. Manag..
[9] Erbao Cao,et al. Trade credit financing and coordination for an emission-dependent supply chain , 2018, Comput. Ind. Eng..
[10] Yongjian Li,et al. Trade credit insurance, capital constraint, and the behavior of manufacturers and banks , 2016, Ann. Oper. Res..
[11] Zhiguo Xiao,et al. The Roles of Bank and Trade Credits: Theoretical Analysis and Empirical Evidence , 2012 .
[12] Ying Wei,et al. Mean-variance analysis of supply chains under wholesale pricing and profit sharing schemes , 2010, Eur. J. Oper. Res..
[13] Wenhui Zhao,et al. Who Should Finance the Supply Chain? Impact of Credit Ratings on Supply Chain Decisions , 2017, Manuf. Serv. Oper. Manag..
[14] Thomas Russell,et al. Imperfect Information, Uncertainty, and Credit Rationing , 1976 .
[15] Stanislav Uryasev,et al. Conditional Value-at-Risk for General Loss Distributions , 2002 .
[16] Chun-Hung Chiu,et al. Store brand introduction in a two-echelon logistics system with a risk-averse retailer , 2016 .
[17] Baowen Sun,et al. A partial credit guarantee contract in a capital-constrained supply chain: Financing equilibrium and coordinating strategy , 2016 .
[18] Wuyi Yue,et al. Quality investment and price decision in a risk-averse supply chain , 2011, Eur. J. Oper. Res..
[19] Tsan-Ming Choi,et al. Diversification strategy with random yield suppliers for a mean–variance risk-sensitive manufacturer , 2016 .
[20] Peng Sun,et al. Risk Aversion in Inventory Management , 2007, Oper. Res..
[21] Fei Ye,et al. Pricing and promised delivery lead time decisions with a risk-averse agent , 2014 .
[22] John R. Birge,et al. Joint Production and Financing Decisions: Modeling and Analysis , 2004 .
[23] John A. Buzacott,et al. Inventory Management with Asset-Based Financing , 2004, Manag. Sci..
[24] Wenhui Zhao,et al. Financing the Newsvendor: Supplier vs. Bank, and the Structure of Optimal Trade Credit Contracts , 2012, Oper. Res..
[25] B. Li,et al. Pricing strategy and coordination in a dual channel supply chain with a risk-averse retailer , 2016 .
[26] Xiangfeng Chen. A model of trade credit in a capital-constrained distribution channel , 2015 .
[27] Harry Matlay,et al. SME financing in the UK and in China: a comparative perspective , 2006 .
[28] Marco Ventura,et al. Public Credit Guarantees and SME Finance , 2006 .
[29] Bin Shen,et al. The Coordination of Fashion Supply Chains With a Risk-Averse Supplier Under the Markdown Money Policy , 2013, IEEE Transactions on Systems, Man, and Cybernetics: Systems.
[30] Xiangfeng Chen,et al. Trade credit contract with limited liability in the supply chain with budget constraints , 2012, Ann. Oper. Res..
[31] Bo Li,et al. Dual-channel supply chain pricing decisions with a risk-averse retailer , 2014 .
[32] Abraham Seidmann,et al. Finance Sourcing in a Supply Chain , 2011, 2011 44th Hawaii International Conference on System Sciences.
[33] Houmin Yan,et al. Channel Coordination with a Risk‐Neutral Supplier and a Downside‐Risk‐Averse Retailer , 2005 .
[34] Access and Risk - Friends or Foes? Lessons from Chile , 2006 .
[35] Houmin Yan,et al. Channel coordination in supply chains with agents having mean-variance objectives , 2008 .
[36] T. Comes,et al. A critical review on supply chain risk – Definition, measure and modeling ☆ , 2015 .
[37] Ying Peng,et al. Supply chain coordination in Confirming Warehouse Financing , 2018, Comput. Ind. Eng..
[38] Marshall L. Fisher,et al. Reducing the Cost of Demand Uncertainty Through Accurate Response to Early Sales , 1996, Oper. Res..
[39] Juan He,et al. Capacity investment in supply chain with risk averse supplier under risk diversification contract , 2017 .
[40] Tsan-Ming Choi,et al. Innovative menu of contracts for coordinating a supply chain with multiple mean-variance retailers , 2015, Eur. J. Oper. Res..
[41] Kevin Cowan,et al. The Effect of Credit Guarantees on Credit Availability and Delinquency Rates , 2012 .
[42] Leora F. Klapper,et al. The Typology of Partial Credit Guarantee Funds Around the World , 2008 .
[43] Yong Li,et al. The bank–firm relationship: Helping or grabbing? , 2016 .
[44] A. Girardi,et al. Partial credit guarantees and SMEs financing , 2014 .
[45] Tsan-Ming Choi,et al. Supply chain risk analysis with mean-variance models: a technical review , 2016, Ann. Oper. Res..
[46] Xinsheng Xu,et al. Coping with Loss Aversion in the Newsvendor Model , 2015 .
[47] Xiaoli Wu,et al. A single-period inventory and payment model with partial trade credit , 2015, Comput. Ind. Eng..
[48] Baowen Sun,et al. Comparative Analysis of Supply Chain Financing Strategies between Different Financing Modes , 2015 .
[49] Xiaoyan Xu,et al. Coordination contracts for outsourcing supply chain with financial constraint , 2015 .