HARMONOGRAMOWANIE ROBÓT BUDOWLANYCH W SYSTEMIE POTOKOWYM Z NIEPEWNYMI DANYMI

[1]  Michael C. Vorster,et al.  LINEAR SCHEDULING AND VISUALIZATION , 1992 .

[2]  Wojciech Bożejko,et al.  Harmonogramowanie robót budowlanych z zastosowaniem algorytmu Tabu Search z rozmytymi czasami wykonania zadań , 2009 .

[3]  Inyong Ham,et al.  A heuristic algorithm for the m-machine, n-job flow-shop sequencing problem , 1983 .

[4]  Mieczysław Wodecki,et al.  A very fast tabu search algorithm for the permutation flow shop problem with makespan criterion , 2004, Comput. Oper. Res..

[5]  Dulcy M. Abraham,et al.  Resource Leveling of Linear Schedules Using Integer Linear Programming , 1998 .

[6]  E. Nowicki,et al.  A fast tabu search algorithm for the permutation flow-shop problem , 1996 .

[7]  Edmundas Kazimieras Zavadskas Book Review. Methods and Models of Research in Construction Project Engineering , 2008 .

[8]  Wojciech Bozejko,et al.  Solving the Flow Shop Problem by Parallel Simulated Annealing , 2001, PPAM.

[9]  Kris G. Mattila,et al.  Comparison of Linear Scheduling Model and Repetitive Scheduling Method , 2003 .

[10]  James E. Rowings,et al.  Linear Scheduling Model: Development of Controlling Activity Path , 1998 .

[11]  Colin R. Reeves,et al.  A genetic algorithm for flowshop sequencing , 1995, Comput. Oper. Res..

[12]  Edmundas Kazimieras Zavadskas,et al.  History and evolving trends of construction colloquia on sustainability and operational research , 2008 .

[13]  Ravi Sethi,et al.  The Complexity of Flowshop and Jobshop Scheduling , 1976, Math. Oper. Res..

[14]  Neil N. Eldin,et al.  DYNAMIC PROGRAMMING ApPROACH TO SCHEDULING OF NONSERIAL LINEAR PROJECT , 1996 .

[15]  David K. Smith,et al.  The application of the simulated annealing algorithm to the solution of the n/m/Cmax flowshop problem , 1990, Comput. Oper. Res..

[16]  J. Vondrák Probabilistic Methods in Combinatorial and Stochastic Optimization , 2005 .

[17]  Wojciech Bożejko,et al.  Scheduling of Construction Projects with a Hybrid Evolutionary Algorithm’s Application , 2011 .

[18]  Yvan J. Beliveau,et al.  HVLS: Horizontal and Vertical Logic Scheduling for Multistory Projects , 1994 .

[19]  Photios G. Ioannou,et al.  Scheduling projects with repeating activities , 1998 .

[20]  Onur Behzat Tokdemir,et al.  Scheduling system for repetitive unit construction using line-of-balance technology , 2001 .

[21]  I. Osman,et al.  Simulated annealing for permutation flow-shop scheduling , 1989 .

[22]  Ching-Hwang Wang,et al.  Controlling activity interval times in LOB scheduling , 1998 .

[23]  Brian C. Dean,et al.  Approximation algorithms for stochastic scheduling problems , 2005 .