Integral Abutment Connections with Grouted Reinforcing Bar Couplers and Ultrahigh-Performance Concrete

Abstract Use of precast elements in the design and construction of bridges, especially for accelerated bridge construction (ABC), has been gaining traction to minimize the impact of closures result...

[1]  M. Najimi,et al.  State-of-the-Art Review of Capabilities and Limitations of Polymer and Glass Fibers Used for Fiber-Reinforced Concrete , 2021, Materials.

[2]  M. Najimi,et al.  Strength and Crack Resistance of Carbon Microfiber Reinforced Concrete , 2020 .

[3]  M. Najimi,et al.  Reinforcement corrosion and transport of water and chloride ions in shrinkage-compensating cement concretes , 2020 .

[4]  Peter O Jansson,et al.  Evaluation of Grout-Filled Mechanical Splices for Precast Concrete Construction , 2008 .

[5]  B. Shafei,et al.  Performance of fiber-reinforced concrete link slabs with embedded steel and GFRP rebars , 2021 .

[6]  B. Phares,et al.  Early-age performance of longitudinal bridge joints made with shrinkage-compensating cement concrete , 2019, Engineering Structures.

[7]  Terry J Wipf,et al.  Precast concrete elements for accelerated bridge construction : laboratory testing of precast substructure components, Boone County bridge. , 2009 .

[8]  James Michael LaFave,et al.  Numerical Simulations of Steel Integral Abutment Bridges under Thermal Loading , 2016 .

[9]  Jong Hak Kim,et al.  Evaluation on the behavior of abutment–pile connection in integral abutment bridge , 2011 .

[10]  Conner D. Huffaker Behavior and analysis of an integral abutment bridge. , 2013 .

[11]  B. Phares,et al.  Longitudinal box-beam bridge joints under monotonic and cyclic loads , 2020 .

[12]  Benjamin A. Graybeal,et al.  Modeling Structural Performance of Second-Generation Ultrahigh-Performance Concrete Pi-Girders , 2012 .

[13]  WooSeok Kim,et al.  Concrete Crack Control of Pile-to-Pilecap Connection in Integral Abutment Bridges under Cyclic Bridge Movement , 2013 .

[14]  Maher K. Tadros,et al.  Engineering Design, Fabrication and Erection of Prefabricated Bridge Elements and Systems , 2013 .

[15]  Jeffrey A. Laman,et al.  Seven-Year Field Monitoring of Four Integral Abutment Bridges , 2012 .

[16]  Michael G. Oliva,et al.  Rapid Bridge Construction Technology: Precast Elements for Substructures , 2011 .

[17]  Bruno Briseghella,et al.  An Innovative Steel-concrete Joint for Integral Abutment Bridges , 2015 .

[18]  Jun Hwan Kim,et al.  Structural details of steel girder–abutment joints in integral bridges: An experimental study , 2012 .

[19]  Michael P Culmo,et al.  Accelerated Bridge Construction - Experience in Design, Fabrication and Erection of Prefabricated Bridge Elements and Systems , 2011 .

[20]  Kevin T. Canning Bridge Design Manual , 2005 .

[21]  Zachary B. Haber Precast Column-Footing Connections for Accelerated Bridge Construction in Seismic Zones , 2013 .

[22]  James Michael LaFave,et al.  Integral abutment bridges under thermal loading : field monitoring and analysis. , 2017 .

[23]  M. Najimi,et al.  Assessment of transport properties, volume stability, and frost resistance of non-proprietary ultra-high performance concrete , 2019 .

[24]  Z. Cui,et al.  Structural performance of deteriorating reinforced concrete columns under multiple earthquake events , 2019, Engineering Structures.

[25]  Habib Tabatabai,et al.  Criteria and Practices of Various States for the Design of Jointless and Integral Abutment Bridges , 2017 .

[26]  M. Arockiasamy,et al.  STATE-OF-THE-ART OF INTEGRAL ABUTMENT BRIDGES: DESIGN AND PRACTICE , 2004 .

[27]  B. Shafei,et al.  Impact of Climate Conditions on Deteriorating Reinforced Concrete Bridges in the US Midwest Region , 2021 .

[28]  M. Najimi,et al.  Chloride penetration in shrinkage-compensating cement concretes , 2020 .

[29]  Brent M. Phares,et al.  Iowa ABC Connections , 2015 .

[30]  M. Najimi,et al.  Flexural Performance Evaluation of Fiber-Reinforced Concrete Incorporating Multiple Macro-Synthetic Fibers , 2018, Transportation Research Record: Journal of the Transportation Research Board.

[31]  Brent M. Phares,et al.  Laboratory and Field Testing of an Accelerated Bridge Construction Demonstration Bridge: US Highway 6 Bridge over Keg Creek , 2013 .