분산형전원 연계용량 증가를 위한 배전계통 운영방식에 관한 연구
暂无分享,去创建一个
When DG interconnection into network is examined, details of the review are overvoltage, protective device malfunction, etc. In the case of protective device malfunction, replacing protective device into bi-directional protective device and installation NGR are the solution. Overvoltage at interconnection point occurs because the load is relatively less than DG output. When overvoltage at interconnection point occurs, DG interconnection is not permitted because this overvoltage affect other customers. Interconnection by installation new distribution line is one solution but it costs much money. Without installation new investment, change of NOP(Normal Open Point) position is a possible solution about DG interconnection into network.
[1] 최병욱,et al. IP 카메라를 위한 HTML5 기반 통합형 Live Streaming 구현 , 2014 .