Evolution in the design and development of the in-service inspection device for the Indian 500 MWe Fast Breeder Reactor
暂无分享,去创建一个
T. Jayakumar | K. V. Kasiviswanathan | Ashutosh Pratap Singh | C. Rajagopalan | V. Rakesh | S. Rajendran | S. Venugopal
[1] Takuya Yamashita,et al. Development of the ISI Device for Fast Breeder Reactor MONJU Reactor Vessel , 2007 .
[2] G. Seed. In service inspection and monitoring of CDFR , 1986 .
[3] Sasan Bakhtiari,et al. Steam generator mock-up for assessment of inservice inspection technology , 1999 .