Ranking cost overrun factors in the mega hospital construction projects using Delphi-SWARA method: an Iranian case study

[1]  K. D. Joshi,et al.  Knowledge manipulation activities: results of a Delphi study , 2002, Inf. Manag..

[2]  Jeffrey S. Russell,et al.  A data-driven approach for identifying project manager competency weights , 2018 .

[3]  Zenonas Turskis,et al.  Integrated evaluation of external wall insulation in residential buildings using SWARA-TODIM MCDM method , 2014 .

[4]  Clinton Aigbavboa,et al.  Validating factors influencing monitoring and evaluation in the Ghanaian construction industry: a Delphi study approach , 2018, International Journal of Construction Management.

[5]  Aaron Mogerman,et al.  Project delivery and contracting strategies for district energy projects in Canada , 2016 .

[6]  Eric Molin,et al.  Characteristics of Cost Overruns for Dutch Transport Infrastructure Projects and the Importance of the Decision to Build and Project Phases , 2012 .

[7]  Zenonas Turskis,et al.  Integrated Fuzzy Multiple Criteria Decision Making Model for Architect Selection , 2012 .

[8]  Stephen C. Hayne,et al.  A comparative analysis of critical issues facing Canadian information systems personnel: a national and global perspective , 2000, Inf. Manag..

[9]  Sarfaraz Hashemkhani Zolfani,et al.  Choosing a Proper Method for Strengthening WPC Beams with Grooving Method Using Swara-Edas , 2018, Archives of Civil Engineering.

[10]  Eeydzah Aminudin,et al.  Development of an impact-on-performance index (IPI) for construction projects in Malaysia: a Delphi study , 2020, International Journal of Construction Management.

[11]  Selçuk Perçin,et al.  An integrated fuzzy SWARA and fuzzy AD approach for outsourcing provider selection , 2019, Journal of Manufacturing Technology Management.

[12]  Merylin Cross,et al.  Q sample construction: a novel approach incorporating a Delphi technique to explore opinions about codeine dependence , 2019, BMC Medical Research Methodology.

[13]  Gary David Holt,et al.  Factors influencing construction time and cost overruns on high-rise projects in Indonesia , 1997 .

[14]  Prasenjit Chatterjee,et al.  Comparative Evaluation of Sustainable Design Based on Step-Wise Weight Assessment Ratio Analysis (SWARA) and Best Worst Method (BWM) Methods: A Perspective on Household Furnishing Materials , 2019, Symmetry.

[15]  Edmundas Kazimieras Zavadskas,et al.  Selection of rational dispute resolution method by applying new step‐wise weight assessment ratio analysis (Swara) , 2010 .

[16]  Majid Vafaeipour,et al.  Assessment of regions priority for implementation of solar projects in Iran: New application of a hybrid multi-criteria decision making approach , 2014 .

[17]  George Wright,et al.  Delphi: A reevaluation of research and theory , 1991 .

[18]  Van Truong Luu,et al.  Delay factor analysis for hospital projects in Vietnam , 2016 .

[19]  K. Wei,et al.  Construction of an Index System for Qualitative Evaluation of Undergraduate Nursing Students Innovative Ability: a Delphi Study. , 2019, Journal of clinical nursing.

[20]  Khaled Nassar,et al.  Evaluating Cost Overruns of Asphalt Paving Project using Statistical Process Control Methods , 2005 .

[21]  The Maximum Prospective Utility Criterion, Utility Maximization in Capital Rationing Under Incomplete Information , 1980 .

[22]  Jae Do Lee,et al.  Cost overrun factor analysis for hospital projects in Vietnam , 2018 .

[23]  Ahmet Öztaş,et al.  Construction cost analysis under uncertainty with correlated cost risk analysis model , 2010 .

[24]  Ahmed Hammad,et al.  Application of knowledge discovery in database (KDD) techniques in cost overrun of construction projects , 2020, International Journal of Construction Management.

[25]  Laura Montalbán Domingo,et al.  New third rail implementation system for conventional railroad tracks in service , 2018 .

[26]  Zakaria Harun,et al.  Contractors' perception of the use of costs of quality system in Malaysian building construction projects , 2012 .

[27]  N. Dalkey,et al.  An Experimental Application of the Delphi Method to the Use of Experts , 1963 .

[28]  Vincent S. Lai,et al.  Managing international data communications , 2002, CACM.

[29]  Ritu Agarwal,et al.  Organizational Mechanisms for Enhancing User Innovation in Information Technology , 1999, MIS Q..

[30]  Jurgita Antucheviciene,et al.  Dam construction material selection by implementing the integrated SWARA–CODAS approach with target-based attributes , 2019, Archives of Civil and Mechanical Engineering.

[31]  Edyta Plebankiewicz,et al.  Model of Predicting Cost Overrun in Construction Projects , 2018, Sustainability.

[32]  Jolanta Tamošaitienė,et al.  A SWARA-COPRAS APPROACH TO THE ALLOCATION OF RISK IN WATER AND SEWERAGE PUBLIC–PRIVATE PARTNERSHIP PROJECTS IN MALAYSIA , 2019, International Journal of Strategic Property Management.

[33]  Suzanne D. Pawlowski,et al.  The Delphi method as a research tool: an example, design considerations and applications , 2004, Inf. Manag..

[34]  Hadi Ghaderi,et al.  Sustainable third-party reverse logistics provider evaluation and selection using fuzzy SWARA and developed fuzzy COPRAS in the presence of risk criteria , 2018, Appl. Soft Comput..

[35]  Dragisa Stanujkic,et al.  A framework for the Selection of a packaging design based on the SWARA method , 2015 .

[36]  José M. Cardoso Teixeira,et al.  Dealing with cost and time in the Portuguese construction industry , 2007 .