Cost Comparison between Stone Mastic Asphalt and Asphalt Concrete Wearing Course

Stone Mastic Asphalt (SMA) technology has been introduced to Malaysia since the 1990’s. Since then, several trials had lain projects had been initiated for the purpose of evaluating the mix on local road condition. However, the acceptability of SMA is still quite discouraging among the local road authorities. This setback is probably due to the misconception on the high initial cost of SMA. But recently, this claim has been challenged. A Malaysian study revealed that the construction cost of SMA is 10% to 15% less than the conventional mix. Hence, this study aims to compare the construction cost of SMA and ACW20. Initially, a population study on 27 SMA and ACW20 projects was initiated with the assistance of a standardized questionnaire. The result indicated that the construction cost of SMA is indeed significantly higher than ACW20. The study recommended that an economic construction cost of SMA is achievable if the cost of material and thickness of the laid surfacing are properly managed.

[1]  Adam Ross,et al.  COST ESTIMATING AND FORECASTING FOR HIGHWAY WORK IN KENTUCKY , 1996 .

[2]  Trefor P. Williams Predicting completed project cost using bidding data , 2002 .

[3]  Tarek Hegazy,et al.  NEURAL NETWORK MODEL FOR PARAMETRIC COST ESTIMATION OF HIGHWAY PROJECTS , 1998 .

[4]  Akintola Akintoye,et al.  A survey of current cost estimating practices in the UK , 2000 .

[5]  Wei Tong Chen,et al.  A method to determine minimum contract bids for incentive highway projects , 2003 .

[6]  Srinath Perera,et al.  Cost Studies of Buildings , 2004 .

[7]  Chester G. Wilmot,et al.  Estimating future highway construction costs , 2003 .

[8]  Zohar J. Herbsman MODEL FOR FORECASTING HIGHWAY CONSTRUCTION COST , 1986 .

[9]  John E. Haddock,et al.  PERFORMANCE OF STONE MATRIX ASPHALT (SMA) MIXTURES IN THE UNITED STATES , 1997 .

[10]  Sivajogi D. Koppula Forecasting Engineering Costs: Two Case Studies , 1981 .

[11]  Hojjat Adeli,et al.  Regularization neural network for construction cost estimation , 1998 .

[12]  Trefor P. Williams Predicting final cost for competitively bid construction projects using regression models , 2003 .

[13]  Bernd Schneider Stone Mastic Asphalt Pavement Technology for the New Millennium , .

[14]  M R Othman Innovative pavements in Malaysia , 2004 .

[15]  Neill Morrison,et al.  The accuracy of quantity surveyors' cost estimating , 1984 .

[16]  H Erdlen,et al.  Stone mastic asphalt: pavement technology for the new millennium , 2000 .

[17]  Garold D. Oberlender,et al.  Predicting accuracy of early cost estimates based on estimate quality , 2001 .